Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 15, 2024 SAM #8236
SOLICITATION NOTICE

Y -- Raystown Lake Water Treatment Plant Upgrades in Hesston, Pennslyvania

Notice Date
6/13/2024 5:55:21 AM
 
Notice Type
Presolicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR24B0015
 
Response Due
6/28/2024 11:00:00 AM
 
Archive Date
07/13/2024
 
Point of Contact
Nastashia Willoughby, Phone: 4109622107, Cheryl K. Williams, Phone: 4109622187
 
E-Mail Address
nastashia.d.willoughby@usace.army.mil, cheryl.k.williams@usace.army.mil
(nastashia.d.willoughby@usace.army.mil, cheryl.k.williams@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This proposed procurement is a Competitive Invitation for Bid (IFB); NAICS 237110 "" Water and Sewer Line and Related Structures Construction� with a size standard of $39,500,000.00. This will be a 100% small business set aside. The U.S. Army Corps of Engineers, Baltimore District (NAB), has been tasked to solicit� for and award construction services for Raystown Water Treatment Plant and Supply� System Upgrades, in Hesston, Pennsylvania. The proposed project will be a� competitive, firm-fixed-price, contract procured in accordance with FAR 14, Sealed Bidding, via an Invitation for Bid (IFB). The purpose of the proposed action is detailed below: The Raystown Lake Project provides potable water to approximately 600,000 visitors annually at Seven Points Recreation Area and marina in Hesston, PA. The Seven Points Water Treatment Plant (WTP) at Raystown Lake is located at 6764 Seven Points Road. It is a surface WTP with clarification and filtration package treatment units, using sodium hypochlorite for primary disinfection providing potable water to the Seven Points Area campsites, marina, and administrative facilities within the recreation area. The WTP went into operation in 1992. The list below identifies the improvements to bring the plant into compliance with PADEP regulations and requirements. The project consists of but is not limited to the following: � Reconfigure the piping of the WTP clearwell � Install actuated valves or pump controls � Modify the water sampling location and add flow measurement � Modify the pressure distribution system discharge pump � Drain, inspect, and clean the clearwell � Replace filter media in both filters. � Replace the filter control panel � May include bid items to install fiber and make required connections along with a fiber-optic connection � Replace PLC and install autodialer with signal callouts and VTScada software � Replacement of the clarifier / filter media, underdrains, and air scour piping in both clarifier/filter units.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/61801aa24b7e45c88415a39012a032c5/view)
 
Place of Performance
Address: Hesston, PA 16647, USA
Zip Code: 16647
Country: USA
 
Record
SN07096483-F 20240615/240613230120 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.