Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 08, 2024 SAM #8229
SOURCES SOUGHT

Z -- Add Alter Paint Barn Decontamination Area for B406

Notice Date
6/6/2024 8:42:05 AM
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
FA3022 14 CONS LGCA COLUMBUS MS 39710-0001 USA
 
ZIP Code
39710-0001
 
Solicitation Number
EEPZ132020
 
Response Due
6/24/2024 5:30:00 AM
 
Archive Date
07/09/2024
 
Point of Contact
Daniel Stilts, Phone: 6624343740, Willie Common, Phone: 6624347780
 
E-Mail Address
daniel.stilis@us.af.mil, willie.common.1@us.af.mil
(daniel.stilis@us.af.mil, willie.common.1@us.af.mil)
 
Description
(See SOW for further description) The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete the addition and alteration to B406 Paint Barn. Perform all work according to this Statement of Work (SOW), the 100% Design, 100% Specifications, and all related AF requirements and other codes and references. Contruction must be accomplished in accordance with applicable UFC�s, ETL�s, (UFC�s and ETL�s may be found on-line at www.wbdg.org) local and national codes, Columbus AFB Installation Facility Standards (IFS) and all Appendices (Special Construction, Mechanical, and Electrical) and other guidance as modified by this SOW. The IFS document may be found at the following location: http://www.wbdg.org/ffc/af-afcec/installation-facilities-standardsifs/columbus-afb-ifs. The government will furnish 100% design documents to the contractor, including drawings (PDF and CAD) and specifications. The contractor is expected to keep accurate redline drawings during construction and submit As-Builts upon project completion. Deliver two (2) hard copies of As-Builts (24�x36�) and one (1) digital copy via DoD SAFE containing each drawing sheet in both PDF and CAD file format directly to the CO, along with AF Form 3000. For uploading to DoD SAFE, the Contractor must request an upload link from the CO and then upload the files using the details in the subsequent email from DoD SAFE. For the As-Built submittal, the contractor is to provide, in addition to the hard copies and digital copies via DoD SAFE, (1) CD-ROM containing the PDF file as well as the associated CAD files in AutoCAD (Release 2020) .dwg file format. Hard copy submittals and CD-ROMs must be delivered to: 14th Contracting Squadron 495 Harpe Blvd, Suite 293 Columbus, MS 39710 The contractor is responsible for verification of existing dimensions, conditions, etc., and constructability based on provided design, and bids should reflect all costs necessary to complete construction. If the contractor encounters any unforeseen site conditions at any time, prior to or after contract award, the contractor must notify the CO immediately before proceeding with any work. BACKGROUND The facility is currently not configured to adequately allow for proper decontamination of personnel engaged in painting operations. Additionally, the facility is currently experiencing air flow issues in the paint process supply/exhaust system. The goal of this project is to configure the PPE locker/decontamination area to meet current requirements and to provide a solution for the issues with the supply/exhaust system in the paint bays. SCOPE OF PROJECT The Project involves a renovation and addition to B406 Paint hangar Administration and Decontamination area. A new fire alarm and mass notification system will be installed through the administration and decontamination area, while existing fire alarm system components will remain as-is in the paint bays. The project involves control work on the mechanical system in the paint bays.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/fb01c08adeae4af0b4a6c80bead1e717/view)
 
Place of Performance
Address: Columbus, MS 39710, USA
Zip Code: 39710
Country: USA
 
Record
SN07089450-F 20240608/240606230126 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.