SOLICITATION NOTICE
Y -- Corrosion and Containment of Hydraulic Pipes at Ball Mountain Lake Dam in Jamaica, Vermont
- Notice Date
- 5/21/2024 5:54:01 AM
- Notice Type
- Solicitation
- NAICS
- 238220
— Plumbing, Heating, and Air-Conditioning Contractors
- Contracting Office
- W2SD ENDIST NEW ENGLAND CONCORD MA 01742-2751 USA
- ZIP Code
- 01742-2751
- Solicitation Number
- W912WJ24B0008
- Response Due
- 5/24/2024 10:00:00 AM
- Archive Date
- 05/21/2025
- Point of Contact
- Tyler Maryak, Phone: 9783188049
- E-Mail Address
-
tyler.s.maryak@usace.army.mil
(tyler.s.maryak@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- There are three hydraulically operated gates located in the Intake Tower at Ball Mountain Lake Dam located in Jamaica, VT. Areas of the existing hydraulic piping, original to the dam construction, are showing signs of moderate to heavy surface corrosion and paint wear. The current hydraulic fluid in use is deemed unacceptable to be discharged into the outlet works per the EPA standards. Due to the piping corrosion present hydraulic piping will be replaced, and the current hydraulic fluid will be flushed and replaced with new environmentally acceptable liquid (EAL). The work for this project will likely include, but not be limited to, the following: a) Replacement of the original hydraulic piping with stainless steel hydraulic piping at the operating room, heating room, elevator landing level, and gate chamber. b) Complete flushing of hydraulic system and replacement of fluid with environmentally acceptable liquid (EAL) fluid. c) Partial re-routing of new hydraulic piping where required. d) Coordination of work with existing hydraulic piping containing lead paint on the surface. e) Removal and disposal of existing hydraulic fluid in accordance with local, state, and federal regulations. f) Removal and disposal of lead coated piping materials in accordance with local, state, and federal regulations. g) Minor structural modifications to the gatehouse to facilitate new hydraulic piping. h) Providing new de-humidification equipment in gate chamber room. i) Providing new sump pump equipment at gate chamber room. j) Replacing existing exhaust air louvers.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/5c719a734a5648ac8831607aa62c6625/view)
- Record
- SN07071685-F 20240523/240521230050 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |