Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 23, 2024 SAM #8213
SOLICITATION NOTICE

Y -- Eldorado National Forest; Placerville Ranger District; 03 - CON - Disaster, Sayles Canyon Trail Bridge Repairs

Notice Date
5/21/2024 9:23:49 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USDA FOREST SERVICE-SPOC SW Washington DC 20250 USA
 
ZIP Code
20250
 
Solicitation Number
12970224R0034
 
Response Due
5/31/2024 3:00:00 PM
 
Archive Date
06/15/2024
 
Point of Contact
G. Jeremy Staggs, Phone: 2814821968
 
E-Mail Address
george.staggs@usda.gov
(george.staggs@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
SCOPE OF CONTRACT: The Government�s general and specific requirements for the repair of the Sayles Canyon Trail Bridge project are as follows: Repair metal stringers/nailers and replace wooden decking and running planks on the trail bridge spanning Sayles Creek. Remove logs, dimensional lumber, and plywood (if any) that served as temporary decking. Minimum dimensions for the Sayles Canyon trail bridge are: 72� width between top railing which shall be no less than 42� above top of deck. The maximum opening of side railings shall be 8�. Contracting Officer Representative (COR) will verify the staging area with the contractor, which is 75 yards up the road and above the bridge site. Contractor shall supply and install all dimensional lumber, associated hardware and appurtenances, as shown in the drawings. Location and mileage from Silver Fork Store in Kyburz, CA: � To Sayles Canyon trail bridge-travel east on Hwy. 50 13.5 miles, turn right on Sayles Canyon Cabin Tract Road (FS 11N16), travel 0.3 miles to the first sharp left-hand turn. The Pony Express trail veers off to the right to the bridge site. � Map(s): See attachments. MAGNITUDE OF CONSTRUCTION PROJECT: The price range for this contract is: Between $25,000 and $100,000. A pre-bid site visit will be held May 22, 2024�: Contractors will meet Forest Service (FS) personnel at 9:00 AM (local time) at the staging area of the lowest elevation bridge, which would be ""Clubhouse"". This would be found on the left (west) side of map Caldor Trail Bridge Relief #1. Traveling eastbound on Hwy. 50, and less than a mile east of the town of Kyburz is FS Road # 11N43, where a sharp left turn is required. This road is not signed on Hwy.50 nor is there a left-hand turn lane. It is unknown how long it will take the group to hike in, assess, and hike out, so it would be best if perspective offerors and FS personnel caravan to the other bridge sites together after the first one. SOLICITATION NO. 12970224R0034 PERIOD OF PERFORMANCE 08/15/2024 THROUGH 11/15/2025 NAICS CODE: 237310 Other Heavy and Civil Engineering Construction, $45M BONDS ARE REQUIRED FOR PROJECTS WITH A VALUE OF $35,000.00 AND ABOVE DAVIS-BACON WAGES APPLY RFIs to be submitted to george.staggs@usda.gov by 1200 CDT May 23, 2024.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b2793ed67aa84ab3b6b155a2f13d7301/view)
 
Place of Performance
Address: Placerville, CA, USA
Country: USA
 
Record
SN07071675-F 20240523/240521230050 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.