Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 16, 2024 SAM #8206
SOLICITATION NOTICE

S -- Coveralls, Rags, & Mats Service

Notice Date
5/14/2024 6:56:42 AM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
812332 — Industrial Launderers
 
Contracting Office
W7M2 USPFO ACTIVITY FL ARNG ST AUGUSTINE FL 32085-1008 USA
 
ZIP Code
32085-1008
 
Solicitation Number
W911YN24R0007
 
Response Due
5/27/2024 10:00:00 AM
 
Archive Date
06/11/2024
 
Point of Contact
Douglas D. Divine, Phone: 9048230557, Darrin Weaver
 
E-Mail Address
douglas.d.divine.civ@mail.mil, darrin.j.weaver.mil@army.mil
(douglas.d.divine.civ@mail.mil, darrin.j.weaver.mil@army.mil)
 
Description
The Florida Army National Guard has a requirement for a nonpersonal service contract to provide coveralls, rags, and mats to 19 locations throughout Florida. We are looking for qualified vendors, especially those in socio-economic categories, to provide quotes for this action. If interested, respond with a Capability Statement and any other supporting documentation demonstrating the ability to successfully complete this action. Coveralls. Five sets per employee issued by size with name tape identifiers. Color and materiel need to be functional in a maintenance shop in high temperatures, flame retardant for up to three personnel. Sleeve length will be determined by each delivery location. Dirty coveralls will be picked up up on a weekly basis, cleaned, and returned the following week when the next pick-up occurs. Rags. These items must be a cotton blend and approximately 14� X 14� to 18� X 18� in size. Dirty rags will be exchanged monthly. Overall clean rag count will be equal to original issue QTY for each drop off Mats. Several types will be needed. Scraper Mats, approximately 3� X 5�, to provide aggressive scraping action and trap dirt and debris in recessed areas until the mats are cleaned. Traction Mats, approximately 4� X 6�, must trap dirt and moisture to protect your floors and enhance the safety of the facility. Rug Runner, approximately 3� X 8�, must trap dirt and moisture to protect your floors and enhance the safety of the facility. Length will be verified by individual location. Floor mats must be exchanged monthly with rag exchange. Period of Performance (PoP) shall be 1 Base Year of 12 months and 4 12-month option years. Place and Performance of Services: The contractor shall provide services between the hours of 0800-1530 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at 19 Locations (see attached document for details on locations and quantities).
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/fa768b847bc545ab84e77e6f776e5247/view)
 
Place of Performance
Address: FL, USA
Country: USA
 
Record
SN07063344-F 20240516/240514230043 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.