SOLICITATION NOTICE
F -- GW&J Lee Ranger District Bottomland Hardwood and Pollinator Restoration
- Notice Date
- 5/14/2024 12:33:20 PM
- Notice Type
- Solicitation
- NAICS
- 115112
— Soil Preparation, Planting, and Cultivating
- Contracting Office
- George Washington/Jefferson National Forest ROANOKE VA 24019 USA
- ZIP Code
- 24019
- Solicitation Number
- 12443924Q0036
- Response Due
- 5/20/2024 9:59:00 AM
- Archive Date
- 06/04/2024
- Point of Contact
- Sarah Davis, Minkyu Kim
- E-Mail Address
-
sarah.davis1@usda.gov, minkyu.kim@usda.gov
(sarah.davis1@usda.gov, minkyu.kim@usda.gov)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- Schedule Notes�a) One award will be made from this solicitation, contractors must submit pricing for all items. Period of Performance�1 JUL 2024 - 30 SEP 2025 Description of Requirement�Shenandoah River Dupont Settlement � Restoration of Bottomland Hardwood and Pollinator Habitat Enhancement on Former Grazing Allotments Treatment of fescue and other non-native�invasive species and the planting of bottomland hardwood and pollinator shrubs for habitat�enhancement in Page and Warren Counties. Location USDA Forest Service, George Washington � Jefferson NF The contract area is within the boundaries of the George Washington and Jefferson National�Forests, North Zone in Page Co., VA, and Warren Co., VA. Refer to Vicinity Map and Contract Area�Maps. ******UPDATED 7 May 2024******* Page 3 reflects correct acreage for the tasks Wetland Pollinators - 7.5 AC Bottomland HW & Shrubs - 36.75 AC VEG & NNIS Treatments - 61.5 AC� Total of 105.75 AC ******UPDATED 14 May 2024******* These have been asked by bidders: 1st) task 1 says pre and post planting treatments�the question was how many acres are treated twice. So, the NNIS only acres are 61.5 acres.� The planting acres are 45 acres.� So, pre-planting acres are 105.75 acres and post-planting treatments are 45 acres again.� Total herbicide use: 150.75 acres (10 ac of which are fencerows and 140 acres of field). 2nd) All of the bottomland hardwood planting areas should be spaced as follows �trees should be spaced at a minimum of 25� and no more than 50� and an average of 30 trees/acre.� In all wetland areas, �Shrubs should be spaced a minimum of 10�-20� apart and an average of 100 per acre. May use live stakes if appropriate. � In Seakford�s Pollinator Medium/Small trees and shrubs area, �Shrubs should be spaced a minimum of 15�-20� apart and should average 100 trees per acre.� 3) Tree shelters and BGR, shelters must be AT LEAST 4� tall, only treat with BGR if stock is above the shelter or if stock is without a shelter/won�t fit into a shelter **The herbicide is provided by the contractor according to what kind of treatment they decide is necessary.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/bc8f4a64988d456d965df1848924339e/view)
- Place of Performance
- Address: Edinburg, VA 22824, USA
- Zip Code: 22824
- Country: USA
- Zip Code: 22824
- Record
- SN07063148-F 20240516/240514230042 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |