SOLICITATION NOTICE
Z -- MKG and GRR TRACON Realignment and Refurbishment
- Notice Date
- 5/9/2024 8:00:43 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- 697DCK REGIONAL ACQUISITIONS SVCS FORT WORTH TX 76177 USA
- ZIP Code
- 76177
- Solicitation Number
- 697DCK-24-R-00243
- Response Due
- 5/15/2024 9:00:00 AM
- Archive Date
- 05/30/2024
- Point of Contact
- Ms. Joni Haynes, STEVIE TABB
- E-Mail Address
-
joni.l.haynes@faa.gov, STEVIE.CTR.TABB@FAA.GOV
(joni.l.haynes@faa.gov, STEVIE.CTR.TABB@FAA.GOV)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- This requirement is for MKG and GRR TRACON realignment and replacement at the Muskegon County Airport (MKG) located in Muskegon, Michigan and the Gerald R. Ford International Airport (GRR) located in Grand Rapids, Michigan. The scope of work includes, but is not limited to, removal of existing obsolete consoles, carpets, ceilings and other work; providing partitions, carpets, ceilings and other work; providing HVAC and electrical work as specified in drawings and specifications. See specifications and drawing in Section J for complete scope of work. ************************************************************************* Amendment 0001 is to incorporate the Question and Answer (Q&A) document and Site Visit sign-in sheets for both facilities as described below: FIRST: The following attachments are hereby released to interested parties as described below: 1. J-6_ Contractor Sign-in sheet-1 2. J-6A_ Contractor Sign-in Sheet-2 3. J-7 Q&A for GRR & MKG Second: The due date for proposals remains the same.�� Third: All other terms and conditions remain unchanged and in full effect.� ************************************************************************* Amendment 0002�is to delete Selective Demolition Section 1.6D from the specifications and update the due date of the proposals as described in the following: FIRST: An additional question was received after the Q&A session had ended. That question is the following: � Line D.1 in section 1.6 �Field Conditions,� on pg. 16 of the solicitation states: �Hazardous materials will be removed by Owner before start of the Work.� However, the plans show areas where asbestos containing materials are to be removed so I just wanted to check and see if we are to follow the solicitation and assume that any asbestos containing materials and other hazardous materials will be removed by the owner or if we are responsible for performing this work. Based on this question, section 02 41 19 Selective Demolition Section 1.6D is hereby deleted from the specifications as the contractor will be responsible for the�removal of hazardous materials identified in the specifications. Updated Specifications are hereby included in this amendment reflecting these changes. ******************************* SECOND: Due to ""FIRST"" above, additional time to propose is hereby granted. The new proposal date is updated below: FROM: May 10, 2024, by Noon EST TO: May 15, 2024, by Noon EST ******************************* THIRD: All other terms and conditions remain unchanged and in full effect.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/adcfaf40597b48979408c3f879efddfd/view)
- Place of Performance
- Address: Grand Rapids, MI, USA
- Country: USA
- Country: USA
- Record
- SN07058686-F 20240511/240509230046 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |