Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 01, 2024 SAM #8191
SOLICITATION NOTICE

Z -- CON-NRM 653-22-116 Create Therapeutic Mindfulness Garden

Notice Date
4/29/2024 9:57:51 AM
 
Notice Type
Solicitation
 
NAICS
561730 — Landscaping Services
 
Contracting Office
260-NETWORK CONTRACT OFFICE 20 (36C260) VANCOUVER WA 98662 USA
 
ZIP Code
98662
 
Solicitation Number
36C26024R0029
 
Response Due
5/6/2024 1:00:00 PM
 
Archive Date
06/05/2024
 
Point of Contact
Toni A Wiser, Contractor, Contract Specialist
 
E-Mail Address
toni.wiser@va.gov
(toni.wiser@va.gov)
 
Awardee
null
 
Description
653-22-116 Create Therapeutic Mindfulness Garden Please confirm the VA Tririga CPMS will not be required, per specification section 01 00 00, 1.34. Correct, this will not be required. Please confirm that one person can act as the site superintendent, the SSHO, and the CQC Manager. One person can act as the site superintendent, SSHO and CQC Manager. The Site Plan Legend on sheet L1.0 has a S1 symbol that states, CIP Concrete Stair with SS Handrail. It refers to detail 3/L3.1. Detail 3/L3.1 shows a galvanized tube steel handrail. Please confirm if this is to be galvanized steel or if it is to be stainless steel. Galvanized steel handrail. Please identify the location of the irrigation controller, as shown in detail 6/L4.2 and where the 110v power source for it is located.  See attached sketch. Please confirm sample panels for the CIP concrete walks will be required as listed in specification section 32 13 13, 1.4, A Mockups. Sample panels are not required. Please confirm the contractor is required to provide the 90-day maintenance period as described in specification section 32 92 00 Turf and Grasses. The contractor will be required to provide the 90-day maintenance period. Specification section 32 90 00 states the landscape planting must be done between October 1st and April 30th. When does the VA anticipate awarding the project and do these dates need to be adhered too? The project is anticipated to be awarded by 6/1. The planting dates need to be adhered to. If required, the project will be placed on hold pending proper planting dates.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/daac447bf67e4b9696423c25522cfa7a/view)
 
Record
SN07045560-F 20240501/240429230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.