MODIFICATION
Z -- Project 512-23-904 4B Water Damage Repair Pt 2
- Notice Date
- 4/17/2024 12:35:48 PM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- 245-NETWORK CONTRACT OFFICE 5 (36C245) LINTHICUM MD 21090 USA
- ZIP Code
- 21090
- Solicitation Number
- 36C24524B0014
- Response Due
- 5/28/2024 11:00:00 AM
- Archive Date
- 07/27/2024
- Point of Contact
- Dirk A Webb, Contract Officer
- E-Mail Address
-
Dirk.Webb@va.gov
(Dirk.Webb@va.gov)
- Awardee
- null
- Description
- Scope of Work NRM Project No. 512-23-904 Repair 4B Water Damage GENERAL SCOPE OF WORK: The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Baltimore Campus. Drywall Replacement Remove all furniture and appliances from within the room and store elsewhere within the work area. Install new drywall section and finish to match the existing. Install new cove base for the entire room. Cove base to match the existing. Move the furniture back into the room after inspection of the room by the VA. Ceiling Replacement Replace all of the ceiling tiles in the 3B work area. Ceiling tiles to match existing. Flooring Replace all previously carpeted flooring with healthcare approved vinyl flooring. Water Legionella hypercholrintion is required. Thoroughly flush and sterilize the water pipes that have been stagnant during the duration of demolition/renovation. Gas Gas lines within these areas must be turned back on after construction activities have concluded. Reference Specifications for more details. Infection Control Barriers Remove and dispose of all erected infection control barriers to return area to working order. See ICRA and project s Drawings and Plans for reference. Interior Finish All interior finishes within renovation areas must be returned to previous working order. These tasks include, but are not limited to, reinstallation of metal cabinets and painting replaced drywall. Reference Specifications for more details. Assumptions These approximate quantities are the expected work to be done for this project. Approx. 2,000 sqft of drywall replacement Approx. 1,000ft of cove base Approx. 2,000 sqft of vinyl flooring Approx. 3,100 sqft of acoustic ceiling tiles Work will be completed in 60 calendar days from Notice To Proceed. The below images are reference for the areas affected by previous mold mitigation work. No further drywall is to be removed for this renovation.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/317b1f1e438f4987b3ccaf78cd697dae/view)
- Record
- SN07032986-F 20240419/240417230055 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |