SOLICITATION NOTICE
Z -- NFSR #250 Reconstruction (M.P. 29.30 to M.P. 47.28) - R1, Nez Perce-Clearwater NFs, North Fork RD
- Notice Date
- 3/25/2024 3:29:35 PM
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- USDA-FS, STEWARDSHIP CONTRACTING BRANCH Washington DC 202501138 USA
- ZIP Code
- 202501138
- Solicitation Number
- 12363N24R4005
- Archive Date
- 04/25/2024
- Point of Contact
- Karen Ruklic, Contract Specialist, Phone: 2087023519, Brandon Anderson, Phone: 208-494-4250
- E-Mail Address
-
karen.ruklic@usda.gov, brandon.anderson4@usda.gov
(karen.ruklic@usda.gov, brandon.anderson4@usda.gov)
- Description
- The objective of the NFSR #250 Reconstruction project is to correct the impacts of ineffective shaping and drainage on the National Forest Service Road (NFSR) 250 and replace end-of-life drainage structures. The project will improve the drivability and drainage of the road system. This project is being performed on the North Fork Ranger District of the Nez Perce-Clearwater National Forests. US Forest Service stewardship funds are being utilized to accomplish watershed restoration while stimulating the local economy; as a stewardship project, advertisement using Full and Open competition is required per USFS policy. The NFSR #250 Reconstruction project requires removal of existing culverts and installation of 62 corrugated metal culverts of varying lengths with diameters of 18"", 24"", and 36"". Work also includes reconditioning the roadways to provide clean ditches and catch basins and appropriate drainage. Riprap, to address a fill slope failure, and aggregate surface course, for installation at culvert replacement locations, shall be supplied by the Government.� Approximately 18 miles of Forest Road shall be treated.� The contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated as Government-furnished), and incidentals necessary to complete the project as required by the contract, plans and specifications. The project is located approximately 30 miles North of Pierce, Idaho. Travel south of Pierce, Idaho via Idaho Highway 11 to NFSR 100 to the intersection with NFSR 250. Work begins on M.P. 29.30 of NFSR 250 and ends on M.P. 47.28 NFSR 250. The Government�s construction estimate is between $250,000 and $500,000.� It is anticipated that the full solicitation with complete technical specifications and drawings shall be issued in mid-April.� Due to the proximity of NFSR #250 to the North Fork of the Clearwater River and fish habitat concerns, road reconstruction work shall be performed between July 1st and October 31st� only.� Work outside of this period is prohibited. Construction work may commence on or after 7/1/2024.� No less than 25% of the total linear feet of corrugated metal pipe required shall be installed by 10/31/2024.� Work during the 2025 field season may commence on or after 7/1/2025.� All work shall be completed by October 31, 2025. �� Bid bonds will be required.� Performance and payment bonds will be required from the awardee.�
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/4d6bb0c6edcb4a79923581d2ae7bc089/view)
- Place of Performance
- Address: Pierce, ID 83546, USA
- Zip Code: 83546
- Country: USA
- Zip Code: 83546
- Record
- SN07007764-F 20240327/240325230052 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |