Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 11, 2024 SAM #8111
SPECIAL NOTICE

Y -- Fort McCoy, WI - Collective Training Officers Quarters

Notice Date
2/9/2024 3:20:41 AM
 
Notice Type
Special Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
W072 ENDIST LOUISVILLE LOUISVILLE KY 40202-2230 USA
 
ZIP Code
40202-2230
 
Solicitation Number
W912QR24R0003
 
Response Due
3/6/2024 7:00:00 AM
 
Archive Date
03/21/2024
 
Point of Contact
Jesse E. Scharlow, Adam Wantland, Phone: 5023156197
 
E-Mail Address
jesse.e.scharlow@usace.army.mil, Adam.Wantland@usace.army.mil
(jesse.e.scharlow@usace.army.mil, Adam.Wantland@usace.army.mil)
 
Description
Pre-Proposal Conference � Informational Meeting Time: 09:00 AM Central Time The Pre-Proposal Conference informational presentation will be conducted on Wednesday, 06 March 2024 at the following location: Building 2113 South J Street, Fort McCoy, WI 54656-5148 Webex Virtual Option: https://usace1.webex.com/meet/jason.l.cain Site Visit to follow: �Future Officers Quarters Site � 1657 South Regimental Ave Fort McCoy, WI, 54656 Please bring a valid driver's license or identification form to gain access to the facility. Please completed the Installation Access forms and email to Mr. Ken Green a minimum of two days prior to the meeting at kenneth.j.green@usace.army.mil. The Primary POC is Mr. Ken Green who can be reached at 608.633.7942 The Secondary POC is Mr. Kyle Burwitz who can be reached at 402.660.6419 Project Information: Collective Training Officers Quarters The U.S. Army Corps of Engineers (USACE) - Louisville District intends to issue a Request for Proposal (RFP), Solicitation No. W912QR24R0003 for the Design-Bid-Build construction of two (2) new 48,000 sf 4-story, Collective Training Officers Quarters (CTOQ). �Work includes standing seam metal roof over rigid insulation on steel deck on structural trusses, utility brick veneer over rigid insulation on steel studs with exterior glass mat gypsum sheathing, concrete floor on metal deck and on-grade, elevator, aluminum doors & windows, gypsum board & metal frame partitions, steel door frames & steel doors, acoustical ceilings, HVAC, plumbing, security, and electrical systems. Air barrier testing and HVAC silver is required.� Construct Site Work to include base proposal demolition, relocation of five existing buildings, site clearing, grading, drainage, utilities, paving, and permits, beyond a line five feet outside each building. The project contains options such as:� 1) Operations and Maintenance, Army Reserve (OMAR) Funded Laundry Equipment Items (washers and dryers); 2) Bona Fide Need Operations, Maintenance � Army Reserve (OMAR) Funded Equipment Items (metal shelving, fire extinguishers, window blinds) ; 3) Install Concrete Pavement on the Mow strips, Sidewalks including the Fire Lane and Pad for Bicycle Rack; 4) Concrete Parking Lot Contraction duration is 1260 days from Notice to Proceed.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/1f3d265f3830484d892483efe5694490/view)
 
Place of Performance
Address: Fort McCoy, WI 54656, USA
Zip Code: 54656
Country: USA
 
Record
SN06961259-F 20240211/240209230050 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.