Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 04, 2024 SAM #8104
SOLICITATION NOTICE

N -- Angeles National Forest Transportation and Installation

Notice Date
2/2/2024 7:51:46 AM
 
Notice Type
Solicitation
 
NAICS
332311 — Prefabricated Metal Building and Component Manufacturing
 
Contracting Office
Southwestern Regional Office, Region 3 ALBUQUERQUE NM 87102 USA
 
ZIP Code
87102
 
Solicitation Number
127EAT24Q0010
 
Response Due
2/9/2024 11:00:00 AM
 
Archive Date
02/10/2024
 
Point of Contact
Donovan Porterie, Phone: (505)589-2893, Erin Scott-James, Phone: (208)590-6768
 
E-Mail Address
Donovan.porterie@usda.gov, Erin.scottjames@usda.gov
(Donovan.porterie@usda.gov, Erin.scottjames@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Description of Requirement A contractor shall supply all labor, materials and supervision to load, transport and install the government furnished double vault toilet.� Tasks include but not limited to excavation, backfill and placement of precast concrete vault and installation of toilet.� Before commencement of work, the Angeles National Forest shall: 1. Provide the contractor the exact placement location by stakes or other approved method. Before commencement of work, the contractor shall: Ensure the worksite is clear of overhead obstructions which may include clearing vegetation, so the worksite is clear and ready for site preparation.�� Provide access to the site for truck delivery and sufficient area for the crane to install and the equipment to perform the contract requirements. The contractor is responsible for all permitting requirements related to this project and traffic control for truck, crane equipment and any delivery vehicle site access required for installation.�� The scope of work will include all excavation and necessary preparation at the site as well as full installation of the toilet. The Contractor shall furnish all labor, transportation, equipment, tools, supervision, materials, and supplies necessary to accomplish this work.� All equipment shall be clean and free of weeds and other debris before arriving on any site.� The contractor shall coordinate with the Contracting Officer�s Representative (COR) two (2) weeks prior to commencement of work. 1. Materials The contractor shall supply:�� Bedding material to be sand or ?� minus crushed or screened aggregate.� Caulking between vault and toilet floor to be 1� x 1� Butyl tape designed specifically to bond precast concrete to precast concrete.� 2. Excavation and Elevation The Contractor shall meet the following:� Comply with all applicable Occupational Safety and Health Administration (OSHA) standards for excavation.� Excavate for the installation of the toilet vault to a depth that will allow the structure site to be free draining after installation is completed.� Allow for a 2� leveling course beneath the toilet vault. Stockpile topsoil in a separate pile at sites.� Finish floor elevation is 4-6� above natural grade measured at the front (entrance) of the exterior slab unless otherwise approved by the COR.� Ideally, the back of the building should be slightly higher to allow water to freely drain out of the toilet rooms.� No excavation is to be left open more than seven (7) days unless otherwise approved by the COR.� o All excavations left open overnight are fenced with wire mesh or plastic mesh fence secured to steel posts all around the excavation.� The bottom of the fence will generally follow the contour of the ground.� Maximum spacing of the steel posts is 10�.� Minimum height of the fence is 36�.� 3. Backfill and Compaction� The contractor shall:� Compact the natural ground at the bottom of the vault excavation with a minimum of three (3) passes with a whacker-type mechanical compactor or equivalent approved by the COR.� Install sand or aggregate bedding material for leveling course if needed.� Compact leveling course with one (1) pass with a whacker-type mechanical tamper or equivalent approved by the COR. Grade leveling course so there are no high spots in the middle of the vault bottom.� Compact with a second pass with a whacker or approved equivalent tamper.� Set vault in place and check for level or appropriate scope.� Backfill around structure.� Use excavated material for backfill except those rocks larger than 6� in maximum dimension shall not be placed within 6� of the exterior vault walls.� Fill, adjacent to the building entry, will have excavated material placed in 8� loose lifts and compacted with a minimum of two (2) passes with a whacker-type mechanical compactor of equivalent approved by the COR.� �4. Finish Grading�� The contractor shall:� Spread excess excavated material from the vault around structure. Intended final grade is flush with the top of the front slab.� Allow for placement of topsoil to reach that grade.� Grade backfill away from structure at maximum slope of 5% unless otherwise approved by the COR.� Spread stockpiled topsoil as final layer after rough grading is completed.� Areas disturbed by excavation, backfilling and stockpiling of excavated materials are hand raked to remove exposed rocks over 1� in maximum dimension.� Oversized rocks removed from the surface shall be disposed of in a designated area within 200� of the site. Government Furnished Items CXT Double Cascadian Vault Toilet
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6023b71025e54af5ac855c2f0dfd91ba/view)
 
Place of Performance
Address: Wrightwood, CA 92397, USA
Zip Code: 92397
Country: USA
 
Record
SN06953422-F 20240204/240202230040 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.