Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 02, 2024 SAM #8102
SOURCES SOUGHT

Y -- NM BR AAO ELBU(1) Elephant Butte Historic Roads

Notice Date
1/31/2024 8:12:14 AM
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF24SS00006
 
Response Due
2/14/2024 1:00:00 PM
 
Archive Date
02/29/2024
 
Point of Contact
Ryan Phillips, Doug Whitcomb
 
E-Mail Address
CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov
(CFLAcquisitions@dot.gov, CFLAcquisitions@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT� INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.� Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn:� Ryan Phillips) for receipt by close of business (2 p.m. local Denver time) on February 14, 2024:� (1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm�s capability to bond for a single project of $10 million, and your firm�s aggregate bonding capacity; and (4) Provide a list of road construction projects of equal or greater value and scope to the NM BR AAO ELBU(1) Elephant Butte Historic Roads project in which you performed work in similar scope. �DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK. The size of a small business firm includes all parents, subsidiaries, affiliates, etc.� Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status.� All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ Project Details: NM BR AAO ELBU(1) Elephant Butte Historic Roads The Elephant Butte Dam approximately 4 miles east of Truth or Consequences, New Mexico, in Sierra County.� The Elephant Butte Lake State Park which is managed by NM State Parks under a lease agreement with the U.S. Bureau of Reclamation.� The project is located at the southern end of the Elephant Butte Reservoir and includes the Damsite area and Paseo del Rio.� The Damsite area includes visitor amenities, a day use area, camping, casitas, and houses to rent. Paseo del Rio offers campsites, river access, hiking and biking trails, and historic information boards. Roads within the historic district also provide access to the largest marina at Elephant Butte Reservoir. SCOPE OF THE WORK:�� The project will use asphalt and aggregate base to resurface, restore, and rehabilitate multiple road segments within the Elephant Butte Historic District including: Dam Site Winding Road A/B, Ruins Road, Hospital Canyon Road A/B, Dam Site Entrance Road, unpaved Dam Site Marina Entrance Road, and Paseo Del Rio Campground Access Road. The Paseo Del Rio River Access Road has native surfacing but will be improved with aggregate surfacing.� Six paved parking lots will be rehabilitated and repaved.� Four additional gravel/native/paved parking lots will be rehabilitated with aggregate surfacing. This project is separated into a base Schedule A, along with two Options, X and Y, to maximize the work that can be completed with the available funds. Schedule A Includes: ������������ Hospital Canyon Road A and B ������������ Dam Site Entrance Road ������������ Winding Road and Approach Roads ������������ Paseo Del Rio Campground Access Road and Approach Roads ������������ Dam Site Upper East and Upper West Parking ������������ Dam Site Recreation Area Restaurant parking and Overflow Parking ������������ Paseo Del Rio Recreation Area Highway 51 River Access Parking ������������ Paseo Del Rio Recreation Area Campground Comfort Station Parking ������������ Old Fish Hatchery Parking ������������ Winding Road Parking Option X includes: ������������ Ruins Road Option Y includes: ������������ Dam Site Marina Entrance Road (concrete) ������������ Dam Site Marina Entrance Road (unpaved) ������������ Dam Site Marina South Parking PRINCIPAL WORK ITEMS: Schedule A 8,500 Cuyd Roadway Excavation 8,000 Cuyd of Waste 21,800 Sqyd Seeding and Mulching each 1 LPSM of temporary traffic control Option X 4,000 Sqyd Prime Coat, Method 1 4,730 Ton, Aggregate Base 4,200 Sqyd Seeding and Mulching each Option Y 3,000 Cuyd Roadway Excavation 3,000 Cuyd of Waste 4,000 Tons of Roadway Aggregate, Method 2, Surface 4,000 Sqyd of Prime Coat, Method 1 6,000 Sqyd Seeding and Mulching each 1 LPSM of temporary traffic control ANTICIPATED SCHEDULE:� The anticipated advertisement date for the project is June 2024 with construction anticipated from August 2024 to May 2025.� DISCLOSURE OF MAGNITUDE:� The estimated price range is between $5,000,000 and $10,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/b5eff443c73d494fa5b37f1b49d07b48/view)
 
Place of Performance
Address: Elephant Butte, NM, USA
Country: USA
 
Record
SN06951461-F 20240202/240131230052 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.