Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 17, 2023 SAM #8055
SOLICITATION NOTICE

Y -- Herbert Hoover Dike Pump Stations S-4 and S-131 Stilling Well Replacements, Glades County, Florida

Notice Date
12/15/2023 2:05:55 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W074 ENDIST JACKSNVLLE JACKSONVILLE FL 32207-0019 USA
 
ZIP Code
32207-0019
 
Solicitation Number
W912EP23R0031
 
Response Due
1/17/2024 11:00:00 AM
 
Archive Date
02/09/2024
 
Point of Contact
William Wallace, Rasheedah Sneeze, Phone: 9042321432
 
E-Mail Address
William.J.Wallace@usace.army.mil, Rasheedah.S.Sneeze@usace.army.mil
(William.J.Wallace@usace.army.mil, Rasheedah.S.Sneeze@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
A Pre-Proposal Conference will be held on Thurday, 14 December 2023 from 10:00am - 11:00am, EST via teleconference.The meeting invitation link is: https://usace1.webex.com/usace1/j.php?MTID=mb1d171bd452770d02f9bf0deff3b25be The call-in number is: 1-844-800-2712 and the ACCESS CODE is: 2760 191 1746. It is requested that an email be sent to rasheedah.s.sneeze@usace.army.mil to confirm attendance by your organization. Description of Work The work is located at the Pump Station S-4 and Pump Station S-131 site(s) respectively. Pump Station S-4 is located on the south side of Lake Okeechobee between Clewiston Florida and Moore Haven Florida in Glades County. Pump Station S-131 is located on the north side of Lake Okeechobee east of Lakeport Florida in Glades County. Each pump station pumps water from the landside of Herbert Hoover Dike (HHD) into Lake Okeechobee. Construction includes fabricating a metal walkway, installing pre-stressed concrete piles, installing below and above grade electrical conduit, constructing a concrete walkway, acquiring, and installing stilling well instrumentation, and running data cable from the stilling well to the onsite control building. The pile supported metal walkway extends from the lakeside toe of HHD into Lake Okeechobee where a stilling well and all associated instrumentation will be installed. Data cables from the stilling well will be routed along the metal walkway to HHD where conduit will transition from above grade to below grade from the metal walkway to the onsite control building. A concrete sidewalk will be installed from the metal walkway to nearby asphalt pavement. A South Florida Water Management District (SFWMD) Right-of-Way permit will be required prior to construction. This contract will have a period of performance of 154 calendar days after notice to proceed. In accordance with FAR 36.204 -- Disclosure of the Magnitude of Construction Projects, the magnitude associated with this requirement is between $1,000,000.00 and $5,000,000.00. NAICS 237990 Small Business Size Standard $45,000,000. THIS IS A TOTAL SMALL BUSINESS SET-ASIDE ACQUISITION. ALL RESPONSIBLE OFFERORS ARE ENCOURAGED TO PARTICIPATE. �
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/9b2eec39533841e4bef5c8ecae356029/view)
 
Place of Performance
Address: Moore Haven, FL 33471, USA
Zip Code: 33471
Country: USA
 
Record
SN06913887-F 20231217/231215230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.