Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 13, 2023 SAM #8051
SOLICITATION NOTICE

S -- Wappapello Lake Mowing Contract

Notice Date
12/11/2023 12:55:56 PM
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
561730 — Landscaping Services
 
Contracting Office
W07V ENDIST ST LOUIS SAINT LOUIS MO 63103-2833 USA
 
ZIP Code
63103-2833
 
Solicitation Number
W912P924Q0008
 
Response Due
1/2/2024 12:00:00 PM
 
Archive Date
01/17/2024
 
Point of Contact
Amanda Sutton, Phone: 5732228562
 
E-Mail Address
Amanda.C.Sutton@usace.army.mil
(Amanda.C.Sutton@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The Contractor shall provide non-personal services, to include all personnel, equipment, tools, supervision, and other items and services necessary to ensure that grounds maintenance is performed at Wappapello Lake, Missouri, in a manner that will promote the growth of healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance. The Contractor�s performance will be based on the Contracting Officer�s (CO), Contracting Officer�s Representative (COR), and Quality Assurance Personnel evaluations of the results required by the Service Delivery Summary and not the frequency or method of performance. It is at the Contractor�s discretion to determine the levels of frequencies to attain the level of service at the best value. The evaluation of results will be based on COR performance assessment, quality assurance results, and customer complaints. Final results of the evaluations will be the determining factor for the success or failure of this contract. The Contractor shall comply with applicable federal, regional, state, and local laws and commercial standards as outlined by the Professional Grounds Management Society (PGMS). When mowing, vegetation control, mulching, and renovation services are required, the Contractor shall contact the COR one business day prior to starting services. Services shall be completed in a continuous clockwise or counterclockwise movement around the project, and shall follow the same path, every cycle, as outlined in the Contractors Grounds Maintenance Master Work Plan (GMMWP). The GMMWP will describe how the Contractor plans to meet the contract requirements and the equipment and manpower to be utilized.�� See items attached for further information.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a942f4a8539b43c4bf136e477cb7be1a/view)
 
Place of Performance
Address: Wappapello, MO 63966, USA
Zip Code: 63966
Country: USA
 
Record
SN06908369-F 20231213/231211230042 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.