Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF DECEMBER 06, 2023 SAM #8044
SOURCES SOUGHT

Y -- AZ FLAP NAV FR136(1)

Notice Date
12/4/2023 1:16:38 PM
 
Notice Type
Sources Sought
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF24SS0003
 
Response Due
12/19/2023 1:00:00 PM
 
Archive Date
01/15/2024
 
Point of Contact
Laura Vallejos, Sheri Walsh
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Description
THIS IS NOT A REQUEST FOR BID - PLANS ADN SPECIFICTIONS ARE NOT AVAILABLE.� THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS� who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs.� Interested businesses must submit the following by email to CFLContracts@dot.gov (Attn: Sheri Walsh) for receipt by close of business (2:00 p.m. local Denver time) on December 19, 2023: (1)�A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor; (2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business; (3) A letter from a bonding agent stating your firm�s capability to bond for a single project of $5 million, and your firm�s aggregate bonding capacity; and (4) Provide a list of bridge, box culverts and trail construction projects of equal or greater value and similar scope to that described herein and in which you have performed roadway reconstruction, asphalt paving, curb and gutter and roadway drainage (cross culverts and storm drainage systems). State whether your firm was the prime contractor or subcontractor on the project.? DO NOT SEND INFORMATION ON PROJECTS THAT?DO NOT INCLUDE THE ABOVE WORK.?� The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/ PROJECT DESCRIPTION:� Joe Tank Road (FR136) provides access to the Los Caballos Trailhead and to Apache-Sitgreaves National Forest. The Project is northwest of Show Low, Arizona in Navajo County. The Project is accessed from North Clark Road (AZ-260) about two miles northwest of West Deuce of Clubs Avenue in Show Low. The project extends 0.6 miles west along Joe Tank Road past the Los Caballos Trailhead #638 in the Apache-Sitgreaves National Forest. There is a base Schedule (0.32 miles) and an Option (0.28 miles). PROJECT NAME:� AZ FLAP NAV FR136(1), Joe Tank Road - 151604NAV1361 SCOPE OF THE WORK:� The project scope includes include providing a wider roadway bench and paved shoulders for approximately 0.6 miles from State Route (SR) 260 to Apache-Sitgreaves National Forest (ASNF) land. The improvements will consist of the removal of the existing asphalt surface and base material and the construction of a new roadway structural section, including new aggregate base and a new asphalt surface. The Project will provide a new paved surface, ditch construction or reconditioning to improve drainage, extending, or replacing culverts, the replacement of a cattle guard, minor City of Show Low utility valve box and manhole adjustments and the installation of new street signage. The existing roadway bench width of approximately 20 feet is proposed to be widened to 24 feet, allowing for curb and curb and gutter on both sides of Joe Tank Road. Access to all approach roads within the project limits must be maintained during construction. PRINCIPAL WORK ITEMS (Totals reflect base Schedule plus Option): 4,500 cubic yards of roadway excavation 5,000 tons of roadway aggregate 1,900 tons of asphalt concrete pavement 6,600 linear feet of curb and curb and gutter 1,150 linear feet of pipe culvert, 3 manholes and 3 inlets 125 cubic yards of rip rap ANTICIPATED SCHEDULE: Advertisement Late January 2024; Award Late March 2024; Construction May 2024 through August 2024. Estimated Range is between $2,000,000.00 and $5,000,000.00��
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/60151bca8ce64f6e8014375bcb60f86a/view)
 
Place of Performance
Address: Springerville, AZ 85938, USA
Zip Code: 85938
Country: USA
 
Record
SN06902079-F 20231206/231204230056 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.