SOLICITATION NOTICE
X -- Usable SF of contiguous Office Space in Huntsville, AL
- Notice Date
- 11/29/2023 10:15:32 AM
- Notice Type
- Solicitation
- NAICS
- 531120
— Lessors of Nonresidential Buildings (except Miniwarehouses)
- Contracting Office
- US ARMY ENGINEER DISTRICT MOBILE MOBILE AL 36628-0001 USA
- ZIP Code
- 36628-0001
- Solicitation Number
- DACA01-5-24-0401
- Response Due
- 12/28/2023 3:00:00 PM
- Archive Date
- 12/28/2023
- Point of Contact
- Martika J. Wimberly, Phone: 251-222-6619
- E-Mail Address
-
Martika.J.Wimberly@usace.army.mil
(Martika.J.Wimberly@usace.army.mil)
- Description
- Delineated Area: 10-15 mile radius from Gate 9 of Redstone Arsenal towards Huntsville International Airport. Facility Requirements:� Total SqFt: 20,000+ Electrical Service: 800Kw HVAC Capacity: 240+ Tons Workspace Capacity: 50 � 100 Users (Dev, Test, Int) (more capacity for developers?) Network Capacity: Ability to establish 10G SDREN connection. Support up to 3 cases concurrently (SoS Integration, Test, V&V, etc.) 3 Cases is the threshold; ability to grow and scale beyond 3 cases is an objective requirement. Support up to 60 personnel for Test & integration and V&V & infrastructure O&M Support up to 175 personnel participating in Integrated Development Teams for SW development, systems engineering, test, cyber, etc. This is an ""objective"" requirement; all others are ""threshold"" unless otherwise stated. Allow Foreign Nationals to enter the facility, and conduct hands-on system integration & test activities, as well as attend demonstrations and conduct collaborative and informative meetings and briefings. Allow for mixed personnel to collaborate in the same physical workspaces. Allow for designated US-only personnel cleared workspaces. Allow for equipment of US and NON-US origins (i.e indigenous components, sensors, comms, models, emulators, and simulators, etc.) for integration, test, evaluation, and validation.� Provide unclassified network services, connected back to IF-IDE hub and SWIF infrastructure. Provide classified network services (Secret collateral, and secret releasable), connected back to IF-IDE hub and SWIF infrastructure. Provide space for 1x full time facility security officer to oversee and manage the industrial security program. 1x FTE based on 3x concurrent cases; security personnel will increase number of concurrent cases/programs and/or selected facility size/layout. Provide space for up to 8x FTE for facility infrastructure and user support. 8x FTE based on 3x concurrent cases; support personnel will increase number of concurrent cases/programs. Provide space for up to 4x FTE for program management and technical oversight personnel. 4x FTE based on 3x concurrent cases; support personnel will increase number of concurrent cases/programs. Case 1 Requirements: Component Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable System Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable Test Line Requirements: Electrical:110v/120v standard quad 10A/15A receptacles HVAC:10 Ton SqFt:1500+ Misc: Seating for up to 12 with desks/workstations/monitors and large wall-mounted displays Physical Security Requirements: Separation from country-specific releasable technology to some NOFORN aspects Physical separation and protection for country-specific program protection hardware resources Ability for FN technicians to operate country-specific program protection hardware during ongoing system integration and component integration activities. Case 2: Component Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable System Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable Test Line Requirements: Electrical:110v/120v standard quad 10A/15A receptacles HVAC:10 Ton SqFt:1500+ Misc: Seating for up to 12 with desks/workstations/monitors and large wall-mounted displays Physical Security Requirements: Separation from country-specific releasable technology to some NOFORN aspects Physical separation and protection for country-specific program protection hardware resources Ability for FN technicians to operate country-specific program protection hardware during ongoing system integration and component integration activities. Case 3: Component Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable System Integration Lab Requirements: Electrical: 100Kw HVAC: 60+ tons SqFt: 1500+ Misc: Cold aisle capable Test Line Requirements: Electrical:110v/120v standard quad 10A/15A receptacles HVAC:10 Ton SqFt:1500+ Misc: Seating for up to 12 with desks/workstations/monitors and large wall-mounted displays Physical Security Requirements: Separation from country-specific releasable technology to some NOFORN aspects Physical separation and protection for country-specific program protection hardware resources Ability for FN technicians to operate country-specific program protection hardware during ongoing system integration and component integration activities.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/dbeace2cfd1948f68a4412949ad1e355/view)
- Place of Performance
- Address: Huntsville, AL, USA
- Country: USA
- Country: USA
- Record
- SN06897490-F 20231201/231129230054 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |