SOLICITATION NOTICE

61 -- Equipment Procurement for the NY HARBOR at CPMT Hybrid Vessel Charing System Project

Notice Date
11/28/2023 12:44:52 PM
 
Notice Type
Presolicitation
 
NAICS
335311 — Power, Distribution, and Specialty Transformer Manufacturing
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS24R0005
 
Response Due
12/13/2023 11:00:00 AM
 
Archive Date
12/28/2023
 
Point of Contact
Michael McCue
 
E-Mail Address
michael.l.mccue@usace.army.mil
(michael.l.mccue@usace.army.mil)
 
Description
The U.S. Army Corps of Engineers (USACE), New York District has partnered with the USACE Marine� Design Center to construct and deliver the new diesel-electric battery hybrid Drift Collection� Vessel DRIFTMASTER II to the New York District at Caven Point Marine Terminal in September 2024.� Upon delivery of the vessel, the vessel will replace the 75-year-old DCV DRIFTMASTER. The DRIFTMASTER II is being currently under construction at ThomaSea shipbuilding in Houma, LA. Ockerman Automation Consultants is under contract with the Marine Design Center to supply the� propulsion and the electronic suite consisting of four (4) Cummins diesel generators, two (2) 1500� HP electric propulsion motors, two (2) 150 HP bow thrusters, all major electrical panels, including� the 750 VDC Links, 480V main switchgear, shore power isolation and hotel load transformers, all� AC/DC inverters, the engine room and navigation control consoles, power management and Integrated� Control and Monitoring Systems, shore power connection panels, and a 3440 kWh 750VDC Energy Storage� System (ESS). NY HARBOR at CAVEN POINT MARINE TERMINAL HYBRID VESSEL CHARGING SYSTEM The equipment provided in this solicitation will be provided by the Government as Government� Furnished Equipment (GFE) to be installed under a separate construction contract to form part of� the new NY Harbor at Caven Point Marine Terminal Hybrid Vessel Charging System shore power station� at the Caven Point Marine Terminal. This new shore power charging station will provide 480VAC� 3-phase power to the new diesel-electric battery hybrid DCV DRIFTMASTER II. The power requirements for the new DCV DRIFTMASTER II while connected to shore power will be 480VAC� 3-phase power delivered at 550A through three (3) parallel three conductor plus ground shore power� cables. These power requirements will provide sufficient power to recharge the ESS from a fully� discharged state to fully charged in 12 hours. The power requirements for the vessel while� connected to hotel power will be 480VAC 3-phase power delivered at 150A through one (1) three� conductor plus ground shore power cable to provide sufficient power to the vessel�s hotel loads in� a winter loading condition. The Caven Point Marine Terminal is located within the New York Harbor at the entrance of the� Verrazano Narrows. The facility withstands hurricane force winds, frequent 40 knot winds, dust,� debris, foreign material, storm surges, and standing water. The facility is home port to three� large crane boat debris collection vessels, three patrol craft and multiple trailered survey and� patrol boats. �
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ade23fa29dd74c06bf423068ccaef7ef/view)
 
Place of Performance
Address: New York, NY 10278, USA
Zip Code: 10278
Country: USA
 
Record
SN06896489-F 20231130/231128230047 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.