SOLICITATION NOTICE
Y -- Tionesta Water Tank Rehab, Tionesta, Forest County, Pennsylvania
- Notice Date
- 11/20/2023 7:57:37 AM
- Notice Type
- Solicitation
- NAICS
- 237110
— Water and Sewer Line and Related Structures Construction
- Contracting Office
- W072 ENDIST PITTSBURGH PITTSBURGH PA 15222-4198 USA
- ZIP Code
- 15222-4198
- Solicitation Number
- W911WN24B8002
- Response Due
- 12/20/2023 8:00:00 AM
- Archive Date
- 02/29/2024
- Point of Contact
- CONNIE FERGUSON, Phone: 4123957551, Janie RONEY, Phone: 412-395-7474
- E-Mail Address
-
connie.l.ferguson@usace.army.mil, janie.l.roney@usace.army.mil
(connie.l.ferguson@usace.army.mil, janie.l.roney@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- Tionesta Water Tank Rehab, Tionesta, Forest County, Pennsylvania, The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the rehabilitation of the elevated water tank at Tionesta Lake, Forest County, PA. The contract generally includes the removal and replacement of interior piping and related appurtenances, removal and replacement of interior 6- inch concrete slab and removable grating, removal and replacement of electric panels, and the removal and replacement of exterior piping. The major features of the requirements are identified below.The contract specifically includes:A. The removal, disposal, and ?in-kind? replacement of all interior pedestal and tank piping and valves including the risers, overflow, and drain lines along with all heat tracing, insulation, supports, and associated appurtenances.B. The removal, disposal, and replacement of the interior 6-in concrete slab to allow for the replacement of any embedded piping. This includes all fill, steel reinforcement, expansion materials, and appurtenances associated with any penetrations though the concrete slab.C. The removal, disposal, and ?in-kind? replacement of the removable grating and its associated angles.D. The removal, disposal, and replacement of the interior electrical panels including Lighting Panel, Safety Switch, Cathodic Protection Panel, and Pump Control Panel. New electrical panels shall functionally duplicate the existing panels.Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.Construction work will occur in close proximity to flood mitigation and recreation areas. The existing facilities are currently operated and staffed by Government personnel 24 hours a day 365 days of the year.Seasonal recreation requires the water tank to be in operation Memorial Day (May 27, 2024) through Labor Day (September 02, 2024). All shutdowns are to be coordinated with the Contracting Officer or designated representative. **** NOTICE ****� �Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to� https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on �View FFP Contract Changes Playbook Here�.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/3b4f3f927b2147de83c7757ee18f1e84/view)
- Record
- SN06890012-F 20231122/231120230047 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |