SOURCES SOUGHT

P -- Demolition of 300K Gallon Water Tank

Notice Date
10/10/2023 5:34:20 AM
 
Notice Type
Sources Sought
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
BROOKHAVEN NATL LAB -DOE CONTRACTOR Upton NY 11973 USA
 
ZIP Code
11973
 
Solicitation Number
JFWaterTowerDemo
 
Response Due
10/20/2023 1:00:00 PM
 
Archive Date
10/21/2023
 
Point of Contact
Joseph Famiglietti
 
E-Mail Address
jfamiglie@bnl.gov
(jfamiglie@bnl.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
REMINDER: EOI's are due by October 20, 2023.� Description: This is an EXPRESSION OF INTEREST (EOI) NOTICE open to all Construction companies that are interested in performing the project described below.��Your response should include a Capabilities Statement demonstrating your ability to perform this scope and your Sam.gov Unique Entity Identifier (UEI).� Capability statements and UEI must be received by BSA no later than October 20, 2023. This EOI is for information and planning purposes and is not to be construed as a commitment by the U.S. Government, nor will the U.S. Government pay for information solicited. The information from this notice will help Brookhaven Science Associates, LLC (herein known as �BSA�), operator of Brookhaven National Laboratory under a Prime Contract with the U.S. Department of Energy survey available resources. PLEASE NOTE THAT THIS IS NOT A REQUEST FOR PROPOSAL, NO SOLICITATION EXISTS AT THIS TIME. � Background and Scope of Work: Brookhaven National Laboratory (BNL) currently maintains two operable elevated storage tanks (water towers) on site.� A large 1-million-gallon structure (not in this scope) on the northeast side of the site that was constructed in the 1980�s, and a 300,000-gallon structure on the southwest side of the site that is original to Camp Upton, constructed in the 1940�s.� The 300,000-gallon elevated storage tank has been in service for 80+ years and has outlasted its intended lifetime use. A new 500,000 gallon water tower is currently under construction and will be commissioned in the short future to meet campus demand to replace the existing 300,000-gallon elevated storage tank.� Following the commissioning and operational transition of the new water tower, the 1940�s vintage water tower will be slated to be demolished.� This procurement is for the demolition and decommissioning of the 1940�s 300,000-gallon elevated water storage tank structure.� The 1940�s vintage structure is comprised of riveted structural steel standing roughly 160 feet tall with approximate diameter of 50 feet.� The existing paint coating system(s) were confirmed via analytical sampling to be lead based paint with elevated levels of Barium and other heavy metals.� All work shall conform to applicable federal, state, and local code requirements.� The scope of work includes the following: Removal and disposal of the 300,000 gallon structural steel elevated storage tank and associated foundations. Removal and disposal of an existing valve vault, 12� asbestos cement water main, and associated appurtenances Removal and disposal of an existing electrical panel Removal and disposal of an existing drain gooseneck Removal and disposal of existing 8�diameter asbestos cement overflow piping Site restoration of the impacted area�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/59b595bbdf4542e7a1a70862b2505912/view)
 
Place of Performance
Address: Upton, NY 11973, USA
Zip Code: 11973
Country: USA
 
Record
SN06856491-F 20231012/231010230123 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.