Z -- DESIGN BUILD 528-19-111 PHARMACY CONTINGENCY COMPOUNDING USP797 BUFFALO VAMC

Notice Date
10/10/2023 5:50:30 AM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
 
ZIP Code
12208
 
Solicitation Number
36C24223R0116
 
Response Due
11/6/2023 12:00:00 PM
 
Archive Date
02/04/2024
 
Point of Contact
Idalia Algarin, Contracting Officer
 
E-Mail Address
Idalia.Algarin@va.gov
(Idalia.Algarin@va.gov)
 
Awardee
null
 
Description
VA Buffalo Medical Center (VABMC) 3495 Bailey Ave Buffalo, NY 14215 Pharmacy Contingency Compounding (USP 797) 528-19-111 07/28/2023 10 | P a g e E Design Build Scope of Work Pharmacy Contingency Compounding USP 797 Project (528-19-111) 28 Jul 2023 General Information 3 Location 3 Background 3 Purpose 3 Objectives 3 Definitions 4 Scope 5 Approach 15 Site Information 16 Applicable Documents 17 Government Documents 17 Veterans Health Administration Western New York Documents 18 Non-Government Publications 18 Order of Precedence 19 Requirements 20 General 20 Investigative Services 22 Detailed Design (65%) and Construction Documents (95%) 23 Construction Documents (100%) 27 Construction Support Services 27 Site Visits 27 Construction 28 Verification 30 Delivery 31 Technical POC 31 Schedule and Deliverables 31 Government Furnished Information, Materials, & Equipment 32 General Information Location Services performed under this scope will be for and conducted in part at the VA Western New York Healthcare System (VAWNYHS), VA Medical Center (BVAMC) located at 3495 Bailey Avenue, Buffalo, NY 14215. Background The Buffalo VAMC was originally constructed in 1947 and is comprised of 25 buildings and structures totaling 1.1 million square feet, the facility has existing Pharmacy prepares both hazardous and non-hazardous drugs and is defined as Medium Risk based on the criteria in USP 800, The existing facility includes an anteroom, two clean rooms, a hazardous and non-hazardous room. The clean rooms contain three laminar flow hood cabinets for sterile compounding and one biological safety cabinet for sterile hazardous preparations. Purpose The purpose of this project is to investigate, analyze and design and build a united states pharmacopeia (USP) 797 compliant, contingency compounding area for non-sterile, hazardous drug preparations as an alternate compounding site to Back-up the main in-patient pharmacy cleanroom suite. The VA has already established a schematic design (SOW Attachment s), the Buffalo VAMC requires a contractor to preform design-build services to complete the design and construct the space. Objectives The objective is to evaluate the existing spaces and supporting infrastructure to develop 100% design documents and construction for a pharmacy contingency compounding space on the 1st floor in Bldg20, (SOW Attachment 02), To continue serving patients and visitors and increase the safety, provide greater redundancy, increase reliability, improve aesthetics and overall user experience Detailed information for these objectives is contained in Section 3: Requirements. Definitions Design-Build (DB) is defined by the Department of Veterans Affairs (VA) as the procurement by the Government, under one contract, with one firm, for both design and construction services for a specific project, the construction contractor hire designer as a sub-contractor to perform the design. Contracting Officer (CO): The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer. Project Manager (COR): The Contracting Officer's Representative responsible for administering contracts under the immediate direction of the Contracting Officer. Design-Build Contract: This term, as used herein, refers to the Contract to perform the design and construction of the project. Builder: This term, as used herein, refers to the contractor under this contract or the DB team. Designer: This term, as used herein, refers to the Architect Engineer s sub-contractor firm that is a part of the DB team and hired by the contractor, The Designer shall be registered in the state of New York. Engineers shall be registered in the state of New York and have a PE. VA: The VA team is comprised of Contracting and Facilities Engineering. The Contracting Officer is the only team member with authority to make contracting decisions. The Contracting Officer s Representative will be delegated the authority to make technical decisions on behalf of the Contracting Officer. Designer-Builder team includes all partners, consultants and subcontractors to a single firm. The Designer-Builder team shall provide Engineering disciplines for the preparation of construction documents, and construction contractor capabilities for construction of the project. Scope The attachments supplied are intended to provide a starting point for existing conditions, certain required items, drawings and specifications, and design parameters to be included in the project but must be verified for accuracy. It is the DB team s responsibility to complete the documents and construction in a manner consistent with the intent of the RFP within the required time period (contract length). It shall be the responsibility of the DB team to verify all items shown on the as-built drawings provided by the VA for this solicitation. The VA will not be held responsible for differing site conditions that is the responsibility of the DB team to verify. The bridging documents provided are a basis of design and general guidance only. All systems related to the existing spaces (communications, architectural, structural, electrical, mechanical, plumbing, sanitary, fire proofing, fire protection, fire detection, building controls, slab penetrations, roofing, hazardous material abatement, etc.) are within the scope of this effort as required to support the final design. Final pharmacy contingency compounding space is expected to be constructed in BLDG 20, 1st Floor, (specifically existing rooms 113, 114, 117). Addition to rooms (113, 114, 117), the work includes the ceiling in hallway to support HVAC modifications and duct work installation. Last, the work includes additional renovation to rooms 100, 100-2,121, 121-1, 121-2, 142, and 221. More details are listed in the scope of work and Space Allocation Plan (attachment 20). SOW Attachments: The following list of documents are attached to this SOW for DB team s use and incorporation into the project documents: Proposed Design Layout for new Pharmacy (See SOW Attachment 01) Proposed Location for new Pharmacy (See SOW Attachment 02) Non-Contact Visitor System Clean Room (See SOW Attachment 03) Sensitive Infrastructure Data Classification FOUO (See SOW Attachment 04) Proposed demolition detail (See SOW Attachment 05) Program guide, PG-18-15 Volume C A/E Submission Instructions for Minor and NRM Construction program dates November 2008 (See SOW Attachment 06) Touchless Door Opener (See SOW Attachment 07) Campus Map (See SOW Attachment 08) Recommend sliding door detail (See SOW Attachment 09) Emergency Release Egress Controls (See SOW Attachment 10) Recommend ADA sink detail (See SOW Attachment 11) Proposed Medicine Refrigerator detail (See SOW Attachment 12) Proposed HVAC Detail (See SOW Attachment 13) Recommend LED 2X4 Light detail (See SOW Attachment 14) Recommend wall dimmer switch detail (See SOW Attachment 15) Recommend LED Exit sign detail (See SOW Attachment 16) Recommend pass-thru air lock window detail (See SOW Attachment 17) Recommend shoe cover dispenser detail (See SOW Attachment 18) Proposed Biological Safety Cabinet (BSC) detail (See SOW Attachment 19) Proposed Space Allocation Plan (See SOW Attachment 20) Investigative Effort Investigative effort is already developed by the VA to provide a schematic design, the VA will deliver to the DB team all the Information gathered and the associated analysis conducted under this investigative effort and the DB team shall use this information to drive the overall design approach. Also, the DB team is responsible to verify all the information gathered through the investigation by the VA and to collect all required info to finish the design. Design Effort An overview of the current, anticipated elements to be included within the design effort are listed below and serve as the basis of design (*Note that this list is subject to change based upon the outcome of the investigative efforts analysis and reports) Note that the design will need to include a project phasing plan that will limit negative impacts on campus operations and allow the hospital to continue to serve patients and visitors. All drawings shall adhere to VA project software requirements for Building Information Modeling (BIM) and Computer Aided Design (CAD) available at http://www.cfm.va.gov/til/projReq.asp. BIM software shall be Revit 2019 or the latest version available to Buffalo VAMC. The DB team shall provide a computer 3D model and prepare various 3D renderings to present to VA throughout the 65% design phase to adequately represent architectural, mechanical/electrical/plumbing (MEP), site conditions and other items in the design to aide with facility visualization and contractor coordination. The project BIM model minimum requirements shall be developed to include the systems described below as they would be built, the processes of installing them and to reflect record drawing conditions (possibly incorporating into the VA Buffalo Medical Center (VABMC). The deliverable model at the SD, DD and CD design phases shall be developed to include as many of the systems described below (but not limited to) as are necessary and appropriate at that design phase. Architectural/Interior Design Square Footage/Volume Room Names and Numbers Architectural Schedules Architectural Specialties and Woodwork Doors Windows Floors Ceilings Vertical Circulation Walls/Curtain Wall Sizes, Shapes, & Material Data General Signage Schedules Furniture Equipment Mechanical HVAC Plumbing Fire Protection Sprinklers Electrical/Telecommunications Power and Lighting Other Engineering Data as Required Asbestos/Hazardous Material Info Security System Information (Access Control, Security Cameras, Panic Alarms, Overhead Paging) Life Safety Information (Fire Extinguishers, Wall Ratings, Door Ratings, Fire Protection/Alarms) Any other drawings related to this design and required to develop the 100% design All work shall be done in accordance with VA Design manuals, VA Construction standards, OSHA Safety Standards and all applicable NFPA codes. Also, the DB team shall be provided the following: Demolition: the approved 65% submission shall answer all the questions, comments, and RFI from the VA engineers, Fire safety, and office of healthcare engineering. The designer shall Provide Demolition Drawings and details, the demolition shall include but not limited to: Full Interior demolition of existing three rooms (113,113-1,114,117) located in Bldg20; 1st Floor. The demolition includes but not limited to: see (SOW Attachments 05) Remove existing partition walls full height floor to floor between room (113 and 114) and wall between (114and 117). Remove the existing counters and sinks and all associated plumbing (113, 114, 117). Remove all the electrical outlets, devices, switches, ceiling lights , data outlets, fire alarm devices, intercom devices, Wi-Fi etc.) and all associated boxes, wiring and parts back to their source. Remove the existing medical gas outlets and all associated fittings, valves, pipes and associated parts back to their source. Remove the existing sprinkler heads and all associated parts rooms 113,113-1,114, 117. Remove the exiting doors and door frames of rooms 113,114,117. Remove the existing doors and door frames for office in room 113-1. Remove the existing hard ceiling, tiles ceiling and all associated parts in room 113, 113-1,114,117. Remove the existing flooring tile, any flooring finishes and all associated parts in room 113,114,117. Any loose furniture and equipment will be removed by the VAMC. Provide drawings and details for temporary isolation and construction partition wall barrier during the demolition and construction phases. Removing water supply lines and sanitary sewer lines back the source including permanent capping or plugging of the lines. This work may not result in the creation of dead-legs in the water supply system. Develop an outage plan to accommodate plumbing, HVAC, electrical and fire protection demolition. The design shall provide phasing detail for any outage during demolition. The design shall provide the minimum outage to the area impacted by the demolition. Construction: The Builder shall start the construction after the Designer received the approved 95% submission, the approved 95% submission shall answer all the questions, comments, and RFI from the VA engineers, Fire safety, and office of healthcare engineering. The designer shall Provide construction Drawings and details; the construction shall include but not limited to: Architectural: Provide Phasing diagrams detail and plan to minimize the impact to patients, employees, traffic area at the location of new construction and around associated work areas. Provide life safety plan and details, include location of existing smoke and fire barriers including doors that may be affected by the new work, include phasing drawing of how emergency egress will be maintained during the course of the project, The contractor shall be responsible for development of the construction phasing plan, infection control risk assessment plan (ICRA), preconstruction risk assessment (PCRA) and the interim life safety measures plan. Provide full drawings and detail for the demolition, see (SOW Attachments 05). Provide separate detailed equipment plan, equipment schedule and associated annotations to be coordinated with the new floor plan. BSC shall be furnished by the VA and installed by the G.C, see (SOW Attachments 19). Provide separate furniture schedule, including furniture furnished and install by others. Provide full detail, schedule and diagrams for the flooring plan, the floor shall be resinous meeting the requirements of the VA RE-3 flooring classification: A- Epoxy flooring basis of design manfu: Stonhard or approved equal. B- Basis of design product: Stontec ERF or approved equal. C- Floor base shall be 6 min. high integral base matching floor finish material. D- The floor design shall provide detail of flush transition from base to wall finish. E- The floor design shall provide integral demarcation line between the Ante room and Buffer room or a color contrasting color change between the areas. The floor finish design shall provide waterproof protection membranes, coatings or finish which prohibit liquid transferring to the floors below. Provide full drawings, detail, schedule and diagram for the reflected ceiling, the ceiling shall be: A- Suspended acoustical tile ceiling manfu: Armstrong or approved equal for the office, storage and break room spaces, see (SOW Attachment 01), also review See VA Design guidelines for size and style. B- Suspended Gypsum Board tile painted ceiling for the Ante room and Buffer room (Solid ceiling with no joints), see (SOW Attachment 01). Provide full drawings, detail, schedule and diagram for the new partition walls, the partition walls shall be: A- 3-5/8 metal studs at 16 o.c. (appropriate gauge for vertical span) with 1-layer 5/8 type X GWB each side to provide a minimum of a 1-hour fire rating. (Equivalent or better than UL#419). B- The existing windows in the office, storage and break room spaces shall be completely sealed and locked from the interior side. C- Provide reconstruction of partition wall/chase at new hand sink as required to fit new sink and provide appropriate clearance for ADA accessibility. D- New 3-5/8 metal studs at 16 o.c. partition wall (appropriate gauge for vertical span) shall be constructed between the Ante room and Buffer room spaces and the other spaces to provide total environmental isolation. Provide Insulation batts in the stud cavity floor to floor, as well as paint finishes on the exterior and interior sides of the new partition, see (SOW Attachments 05). E- Repair to match any partitions and constructions disturbed by demolition work to coordinate with new finishes and provide appropriate new or matching fire rating or existing smoke barriers. F- Provide patching or fire sealants of ALL penetrations in existing partitions surrounding the renovated spaces to conform to code and other regulations. Provide full drawings, details, schedule, appropriate door hardware and diagrams for the new doors and door frames. The doors and frames shall be as follows: A- Automatic Sliding doors compliant with ISO Class 5 cleanroom, with electric drive operators and associated accessories. B- The VA references the use of the following sliding door manuf.: Horton type Negative, Positive, & Combination Pressure room Systems isolation doors with breakaway feature on active slider only or an approved manufacturer equivalent, see (SOW Attachments 09). C- The sliding door package frame shall not exceed 7 -0 in width x 7 -6 in height (total unit size) with a minimum clear opening width of 3 -6 wide. D- The sliding door shall include touchless operators with hand-wave motion sensor activation included on both sides of each sliding door unit. (4 touchless activation sensors are required) All hardware, controls and accessories shall be provided with the door package. E- The main door, frame and hardware entering the pharmacy area from the existing hallway shall be 3 -6 width and 7 -0 height with a minimum 1-hour fire rating. Hardware requirements as per VAM guidelines and direction from VA for security purposes. The pharmacy shall include stainless steel pass-thru air lock box with HEPA Filter and should be compliant with the USP 797, USP 800 design guide, see (SOW Attachments 17) or approved equal and see (SOW Attachments 01) for VA recommended location. Provide full drawings, detail, schedule for the ceiling and partition wall paint, the paint shall be: A- The VA recommend to use for Ante room and Buffer room walls and ceiling are to be Epoxy manuf: Sherwin-Williams aquarmor WBU water-based urethane gloss or approved equal. B- The VA recommend to use for office, storage and break room walls basis of design manuf: Sheriwn-Williams PRO industrial waterborne catalyzed epoxy high build glazed coating or approved equal. C- Provide minimum 2 coats of primer and 2 coats of finish paint or more to achieve full paint color density and required coverage. Colors selection shall be by VA. Provide full drawings, detail, schedule and diagram for the millwork/casework, see (SOW Attachment 01) for initial casework layout and detail Fire Protection: Provide full drawings, detail, schedule and diagram for the fire protection, the fire protection shall be: A- Sprinkler heads in each space ( Ante room, Buffer room, Break room) and many of sprinkler heads required for the office and storage area per latest NFPA regulations. B- The sprinkler heads shall be quick response type and not be concealed. C- The design detail shall provide all hangers, supports, expansion of existing sprinkler line as necessary to accommodate new location of new heads see (SOW Attachments 05). The design/construction shall provide phasing detail for any outage during demolition, expansion and installation of the sprinkler heads. The design/construction shall provide the minimum outage to the area impacted by the construction. Plumbing: Provide full drawings, detail, fixture schedule and diagram for the plumbing work, the plumbing shall be: A- Provide stainless steel sink with built-in emergency eye wash station. B- The sink shall be complaint with ADA requirements. C- The sink shall be in location where show in the (SOW Attachments 01) for space and plumbing purposes, also provide reconstruction of wall chase as needed to accommodate new sink. D- The VA recommends to use this sink: model: Just Manufacturing Company JPH-ADA- 2230-CT or approved equal, see (SOW Attachments 11). E- Provide drawings and detail for all the demolition of existing plumbing fixtures. F- Provide sink in the break room area, see (SOW Attachments 01) for proposed location. The design/construction shall provide phasing detail for any outage during demolition, expansion and installation of the sink. The design/construction shall provide the minimum outage to the area impacted by the construction. All plumbing dead legs created as the result of this project shall be removed. Mechanical: Provide full drawings, detail, mechanical schedule and diagram for the HVAC work, the HVAC shall be: A- Provide full drawings detail, dimension, schedule of new ductwork plan. B- The HVAC Plan shall provide all the details and calculations of ACH, CFM, sizes of ductwork, diffusers etc. C- Provide full detail and schedule for the mechanical Rooms (Ante, Buffer, office, storage and break room) air balance chart D- The HVAC system shall be design to provide a minimum of 35 ACH. E- The HVAC system shall include Automatic and manual dampers to adjust the ACH. F- All the supply diffusers shall have high efficiency particulate air (HEPA) filtration. G- the Buffer room shall be positive pressure to the ante room and provide a minimum of 12 ACH according to the USP 797 design guide and (ISO 7) classification, also 0.03 minimum of water column must be maintained relative to adjacent spaces. H- The Ante room shall be positive pressure to the office space and provide a minimum of 6 ACH according to the USP 797 design guide and (ISO 7) classification, also 0.03 minimum of water column must be maintained relative to adjacent spaces. I- The office area, storage and break room shall be negative pressure according to the USP 797 design guide and (ISO 7) classification, also 0.02 minimum of water column must be maintained relative to adjacent spaces. The VA designed the initial one-line diagram of the HVAC in the pharmacy, see (SOW Attachments 13). The design/construction shall provide phasing detail for any outage during demolition, expansion, extending and installation of the HVAC. The design/construction shall provide the minimum outage to the area impacted by the construction. Electrical: Provide full drawings, detail, fixtures schedule and diagram for the electrical work, the electrical shall be: A- The entire pharmacy shall be powers from electrical EM panel according to the USP797 design guide. B- The Existing AHU shall be updated to receive power from existing electrical EM. C- All devices in the pharmacy shall be hospital grade rated with stainless steel cover plates. D- All wires in the pharmacy shall be hospital grade rated. E- No exposed and aluminum wires allowed by VA design guide. F- All the ceiling lighting shall include EM battery backup. G- The VA recommend to use for the Ante room and Buffer room, 2x4 LED clean room, static troffer, hospital grade, flush steel, universal voltage with dimming capable basic design Lithonia or approved equal. H- The VA recommend to use for the Office area, storage and break room, 2x2 LED clean room, static troffer, hospital grade, flush steel, universal voltage with dimming capable basic design Lithonia or approved equal. I- The VA recommend to use recessed exit LED sign, stainless housing, universal voltage basic design Lithonia or approved equal, see (SOW Attachments 16). J- The VA recommend to use 2x4 LED, recessed, hospital grade, universal voltage basic design Lithonia or approved equal, see (SOW Attachments 14). K- All the switches shall be dimming capable, universal voltage, basic design Lithonia (sPODMRA) or approved equal, see (SOW Attachments 15). The pharmacy shall be included pressure/temp/humidity controlling system, see (SOW Attachments 01) for VA recommend location. The pharmacy shall be included intercom station system, also the intercom shall be stainless steel and shall be voice activate and touchless at the SCA area, see (SOW Attachments 01) for VA recommend location. The pharmacy shall be included battery charger and researchable battery pack for PPE equipment, see (SOW Attachments 01) for VA recommend location. The pharmacy shall be included shoe cover dispenser, see (SOW Attachments 01) for VA recommend location and see (SOW Attachments 18) or approved equal. The pharmacy shall be included control access door (card reader) for the main door, see (SOW Attachments 01) for VA recommend location. Provide full detail, line diagram and schedule for the TEL/DATA outlets where needed for the equipment, workstation and other units. Provide detail, line diagram and schedule for the security camera s, the cameras shall be complaint with USP 797 design guide and covering the four locations (office, storage, Ante, Buffer) and also outside the main door. The design/construction shall provide phasing detail for any outage during demolition, expansion, extending and installation of the electric. The design/construction shall provide the minimum outage to the area impacted by the construction. Add 3 new emergency electrical panels for basement, 1st, and 2nd floor. The size of the panels are 250A, 120/208V, MCB and the exact location of the panels will be determined during the investigation phase. Fire Alarm: Provide full drawings, detail, fixture schedule and diagram for the fire alarm work, the fire alarm shall be: A- The fire alarm devices shall be compliant with USP 797 design guide. B- The existing fire alarm system in the VA is Simplex (Johnson control). C- The pharmacy shall be included Audio/Visual device at each room (office, storage, SCA). D- No smoke/CO detectors required according to VA design guide and life safety. Provide full drawings and detail for the fire alarm riser and schedule. The design/construction shall provide phasing detail for any outage during demolition, expansion, extending and installation of the fire alarm. The design/construction shall provide the minimum outage to the area impacted by the construction. As Built and Record Documents VA Record drawings will be provided upon request. Although the VA makes every effort to keep drawings current to existing conditions, changes and updates are sometimes not recorded. It is therefore the contractor responsibility to perform field investigation and verify of the accuracy of the drawings with the actual conditions. Quality Assurance/Quality Control Plan The DB team is responsible for reviewing the work done by any subcontractors that the DB team has hired to assist with the completion of this SOW. The DB team must provide the Government with a Quality Assurance/Quality Control (QA/QC) Plan that documents the methods, processes, procedures that are going to be implemented by the Consultant to validate the work their subcontractors perform. See PG-18-15: MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS (as modified for (528-19- 111)), Part I, Section D. Hazardous Materials Hazardous Material Removal is anticipated for this project. The DB team is required to perform an inspection (to include destructive investigation and testing if necessary) of the areas to be renovated to identify and test suspect materials. If no suspect materials are identified and no tests conducted, then the DB team shall document this result in writing on corporate letterhead. If suspect materials are identified and tested positive for hazardous materials, then the DB team shall submit a written report documenting the survey conducted that includes the test results. The DB team shall then be responsible for developing the appropriate abatement drawings and specifications in accordance with PG-18-15: MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS (as modified for (528-19-111)), Part I, Section O. Construction Cost Estimate The DB team is responsible for the development of an independent construction cost estimate at several points throughout the design process. The DB team shall advise the Contracting Officer in writing if the anticipated cost of the construction effort is considerably different from the construction limitation dollar amount (i.e., the funds allocated for the construction effort). Personal Protective Equipment (PPE) The DB team is responsible for obtaining / providing, inspecting, and maintaining any required Personal Protective Equipment (PPE) necessary to perform services identified in this SOW. Approach This Scope of Work has been broken down into general requirements that are applicable to the entire contract as well as several separate parts: General (Section 3.1) Detailed Design (65%) and Construction Documents (95%) (Section 3.4) Construction Support Services (Section 3.6) Site Visits (Section 3.7) Construction (Section 3.7) The DB team shall adhere to the general requirements when providing any design related services or construction services. Design Phase Definitions and Timing Although there is a formal phasing required for this project (See SOW Attachment 21), work shall be focused on the same general portion of the building in order to minimize disruptions to the facility. The project drawings provide a recommended phasing plan to minimize the outage and keep the facility operate during the construction; however, the contractor may submit their own phasing plan to the VA for review and approval. All design phases are an iterative process where the DB team obtains client input, refines the design, and then presents the updated design for client feedback/approval. The number of design submissions required in this SOW reflects the iterative nature of this process while the percentage moniker for each submission (e.g., 65%, 95%, and 100%) reflects the level of information contained in each submission. The contents and format of each submission are also located in PG-18-15: MINIMUM REQUIREMENTS FOR A/E SUBMISSIONS (as modified for Project: (528-19-111)). Site Information Access Although the VAMC is a public facility, access to facility maintenance areas, electrical areas, mechanical areas, roof access, and certain other portions of the medical facility are restricted from the public. Accessing these areas may require advance notice, pre-approval, and scheduling to gain entry. All visits and access requests to the VAMC under this scope of work shall be coordinated through the COR.Access to select areas may only be accommodated outside of normal operating hours (M-F 7:00 am 4:30 pm). Photography It is VHA policy to respect the privacy of all persons (e.g., Veterans, patients, residents, members of the VHA workforce, and visitors) consistent with the needs of operating a national health care system. Privacy protections on VHA premises vary according to the needs and purposes of different types of areas, the persons included, and the purpose of the production and use of photographs, digital images, and video or audio recordings (excerpt from VHA Directive 1078). Photography of as built and site conditions are permissible actions under this SOW when photography activities are coordinated with the COR. The DB team shall ensure that any photographs taken do not include any VHA patients, members of the VHA workforce, or visitors to the facility. Applicable Documents The following documents are applicable to this Scope of Work (SOW) to the extent specified herein. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3 of this SOW, whether or not they are listed here. Government Documents The VA Technical Information Library (TIL) available at http://www.cfm.va.gov/til/index.asp is managed by the VA Office of Construction and Facility Management and is the master repository for all VA Numbered Standards for Construction to include design and construction specifications, procedures, standard details, BIM/CAD standards, equipment guides, space planning and design guides. The documents of the TIL shall be the minimum design criteria for all VA projects performed in the construction of new facilities and the modernization, alteration, addition, or improvement of its real property. All design documents shall be developed in accordance with the VA TIL, including (but not limited to) the following listed Department of Veterans Affairs Referenc...
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/daf650b198c54fcf9d3e45ac2cdffe2a/view)
 
Record
SN06855914-F 20231012/231010230119 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.