Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 07, 2023 SAM #7984
SOLICITATION NOTICE

Z -- Kissimmee River Restoration Project S-69 Weir Repair, Okeechobee and Highlands Counties, Florida

Notice Date
10/5/2023 1:10:53 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT JACKSONVI JACKSONVILLE FL 32207-0019 USA
 
ZIP Code
32207-0019
 
Solicitation Number
W912EP23B0021
 
Response Due
10/23/2023 10:00:00 AM
 
Archive Date
12/20/2023
 
Point of Contact
Ligaya Lowe, Phone: 9042322750, Manuela Voicu, Phone: 9042321387
 
E-Mail Address
ligaya.m.lowe@usace.army.mil, manuela.d.voicu@usace.army.mil
(ligaya.m.lowe@usace.army.mil, manuela.d.voicu@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
The scope of work for this project is to re-establish a permanent concrete weir to the design elevations shown in the Drawings near the northwest corner of the S-69 Weir. The scope of work within the northwest corner includes demolition of the temporary repair and the existing structure, construction of new cast-in-place concrete works, and placement of existing riprap in the sump. Demolition work includes removal of the entire temporary weir (riprap and non-excavatable CLSM), removal and stockpile of select areas of riprap and gravel in the sump to the limits and elevations shown in the Drawings, complete removal of the concrete cap to the limits shown in the Drawings, select removal of the concrete driving slab to the limits shown in the Drawings, and select cutting of the existing steel sheet pile to the limits and elevations shown in the Drawings. Concrete works include incidental earthwork (excavation, compaction and backfill), and complete construction of a slab-on grade with a turned-down edge, a concrete haunch, and two sections of concrete cap. Concrete construction include placement of steel reinforcing, placement of formwork, placement of steel dowels, placement of expansion joints, placement of ready-mix concrete, finishing and curing of placed concrete. In addition, concrete works include placement of foundation grout beneath the existing concrete driving slab through cored holes within the slab to fill voids that were not entirely filled during the temporary repair. The scope of work also includes placement of the previously excavated and stockpiled riprap and gravel adjacent to the weir. The access to the work area is the existing gravel-surfaced levee and by a temporary access road along the exterior limits of the weir sump as shown in the drawings. The materials for the access road are from the area designated in the drawings. The temporary access road will be removed at the conclusion of construction. The existing gravel-surfaced levee will be maintained throughout the duration of construction. A Pre-Bid Conference will be held via teleconference on 10 October 2023 at 10:00am, EDT.� The call-in number is: 1-844-800-2712 Access code: 199 262 9798 and the link to be utilized is as follows: https://usace1.webex.com/meet/timothy.g.humphrey It is requested that an email be sent to Timothy.G.Humphrey@usace.army.mil no later than 6 October 2023 at 1:00 PM, EDT to confirm attendance by your organization.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d8c119790c71439284febe19ef648444/view)
 
Record
SN06854172-F 20231007/231005230044 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.