SOLICITATION NOTICE
Z -- Hanger Light Replacements
- Notice Date
- 9/19/2023 2:23:31 PM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- NAVAL AIR WARFARE CENTER CHINA LAKE CA 93555-6018 USA
- ZIP Code
- 93555-6018
- Solicitation Number
- N6893623Q0254
- Response Due
- 10/10/2023 4:00:00 PM
- Archive Date
- 10/10/2024
- Point of Contact
- Beth Exzabe, Phone: 7607933849, Deborah Sorem, Phone: 7607933590, Fax: 7609393095
- E-Mail Address
-
beth.a.exzabe.civ@us.navy.mil, deborah.sorem2.civ@us.navy.mil
(beth.a.exzabe.civ@us.navy.mil, deborah.sorem2.civ@us.navy.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- The purpose of this amendment is to include 52.252-3 in section L posting of questions and answers received regarding hangar light replacements. Closing date and time of 10/10/2023 at 4:00 PM PST remains unchanged. Submit quotes via email to Beth Exzabe at Beth.a.exzabe.civ@us.navy.mil. 1 . What is the height from finished floor to highest point in Hangar? Answer: The height from floor to the interior hangar ceiling 28�01�. 2. Is the hangar clear of obstacles or is Contractor to put into price, moving of objects to get lifts in to complete work? Answer: The hangar is occupied with jets and drones.� The government representatives (Rodney and Nick) will work with the tenants to move equipment around the work area and man-lift during this construction.� 3. What size wire is currently feeding Lighting panel �LPA�? Answer: The actual wire size from the main switchboard to panel LP is unknown.� However, it is 225A panel so it should be 4#4/0 under 75C. 4. It states that the Site Safety and Health Officer may also serve as the Site Superintendent. It than states that the Quality Control can be a �Roving Project Manager� Does this mean that the SSHO and Superintendent are one hat and to be on-site at ALL times and the QCM does NOT have to be on-site at all times but as needed? This would mean the contractor is to put one hat into proposal? Answer:The Part 2a required a full time Superintendent and a part time (roving) QC manager.� So just a superintendent will not meet the requirements of Part 2a.� The QC position (second Hat) will need to be proposed, but it will not need be a full time position.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/af40becf10b84441acd6a4daec01faad/view)
- Place of Performance
- Address: Point Mugu NAWC, CA, USA
- Country: USA
- Country: USA
- Record
- SN06837103-F 20230921/230919230053 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |