Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 31, 2023 SAM #7947
SOLICITATION NOTICE

Y -- NM FS 141(1) South Fork Negrito Creek Bridge

Notice Date
8/29/2023 9:56:49 AM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
6982AF CENTRAL FEDERAL LANDS DIVISI LAKEWOOD CO 80228 USA
 
ZIP Code
80228
 
Solicitation Number
6982AF23B000032
 
Archive Date
09/29/2023
 
Point of Contact
Leslie Karsten
 
E-Mail Address
cflcontracts@dot.gov
(cflcontracts@dot.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THIS IS NOT A REQUEST FOR BID � PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. Project Details: NM FS 141(1) South Fork Negrito Creek Bridge This project is located in the Gila National Forest in western-central New Mexico. The terrain is rolling and mountainous with elevations ranging up to 7500 ft. The South Fork Negrito Bridge was constructed in 1959 and is past its design life of 50 years.� The deck has areas of delamination, the curbs are 100% delaminated and spalled and the stringers have flexure cracks. The most recent inspection report indicates the structural evaluation of the bridge to be in poor condition.� This project replaces this bridge with a similar structure, adds bridge rail, transition and guardrail, and paves approaches 100' on each side of the bridge to keep rocks/debris/soil off the deck and to prevent sediment from entering. This project consists of replacing an existing bridge structure on Forest Route 141 (MP 24.36) over the South Fork Negrito Creek in Catron County, New Mexico.� The existing single-span bridge�s overall length is 40.8-ft and width (out-out) measures 26.4-ft.� The existing roadway width is 24.0-ft. Principal Work Items: Approximate quantities for major work items: 1 (LPSM) of Removal of Existing Structures and Obstructions 1,550 CUYD of Embankment Construction� 200 CUYD of Riprap 550 TON of Roadway Aggregate 26-ft x 76-ft of Prefabricated Steel Bridge 142 LNFT of Drilled Shafts, 24-inch diameter 150 TON of Asphalt Pavement��������������������� 200 LNFT of Guardrail, including terminals 100 hours of Equipment Hours���������� 120 hours of Labor Hours Additional Information for Notice: Adjacent segments of Forest Route 141 will remain closed during construction and can be used for contractor staging and storage.� Access is to both sides of the bridge is possible by detour. Deep foundations (micro-piles or drilled shafts) are anticipated It is anticipated this project will be advertised in September 2023 and awarded in December 2023. Construction will run from April 2024 thru October 2024. The estimated price range of the project work is between $2,000,000 and $5,000,000.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/79b0f5b4c16d4a5aaf58326d9eb3a2ee/view)
 
Place of Performance
Address: Reserve, NM, USA
Country: USA
 
Record
SN06810757-F 20230831/230829230101 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.