SOLICITATION NOTICE
J -- X-Ray Producing System Maintenance
- Notice Date
- 6/23/2023 7:33:57 AM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 811210
—
- Contracting Office
- FA8132 AFSC PZIMC TINKER AFB OK 73145-3303 USA
- ZIP Code
- 73145-3303
- Solicitation Number
- FA813223Q0036
- Response Due
- 6/26/2023 10:00:00 AM
- Archive Date
- 08/01/2023
- Point of Contact
- Jennifer Azbill, Michael Acree
- E-Mail Address
-
jennifer.azbill@us.af.mil, michael.acree.8@us.af.mil
(jennifer.azbill@us.af.mil, michael.acree.8@us.af.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Description
- PREVENTIVE AND REMEDIAL MAINTENANCE FOR X-RAY PRODUCING SYSTEM *AMENDMENT 4: Any reference to�International Fluid Power Society (IFPS) Certifications has been removed. This is NOT a requirement for this solicitation. The due date for quotes has been extended to 26 Jun 2023 in the event any changes are needed for quotes already submitted. *AMENDMENT 3: The closing date for this Combined Synopsis Solictation has been extended to 23 Jun 2023 by 12:00PM (noon) CDT. *AMENDMENT 2: Mandatory clause�52.204-27, Prohibition on a ByteDance Covered Application, has been added to the solicitation. Please see the attached CSS Amendment 2 for full details. *AMENDMENT 1: Questions and Answers below; Correction to Section�C., Capability and Experience Document, in�the CSS in response to Question 2(please see attached CSS, Amd 1) * QUESTIONS AND ANSWERS 1. Question: The required training listed under section 1.50 PWS. How many hours of training is this? Answer: The training listed under PWS 1.50 is given by the Contracting Officer�s Representative (COR), and can be accomplished in approximately 1 hour. 2. Question: Inf the RFQ it has the following: C. Capability and Experience Document � the Offeror will provide the Government with information about their experience performing the same or similar type of work on an IFPS-certified Level 3 industrial hydraulic systems within the last 5 years. Information should include, but is not limited to: i. The ability to obtain and provide employees with International Fluid Power Society (IFPS) Certification commensurate to the size and complexity of this system (see the attached Performance Work Statement � or PWS � para. 1.3.2 for details). The above credential has nothing to do with maintaining Xray systems, is this a mistake? Also section 1.3.2 doesn�t exist in the PWS. Answer: This was an error on my part. Please see the CSS, Amendment 1 for the correct information. 3. Question: The statement for RM (Rate must be a fully-burdened labor rate). Does that mean travel to and from is included in the hourly rate? Answer: No � travel is not included. Fully Burdened Hourly Labor Rate means an hourly rate that includes all salary, overhead costs, general and administrative expenses, and profit. It�s the total cost to a company for hiring and maintaining an employee. The fully burdened labor rate is higher than the basic labor rate because it includes that employee�s portion of overhead, etc. ***See attached Combined Synopsis Solicitation, Performance Work Statement, Equipment List, Wage Determination and Quote sheet for more details.***
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/d987eb8d0f144e59be3ca5c62f84915c/view)
- Place of Performance
- Address: Tinker AFB, OK 73145, USA
- Zip Code: 73145
- Country: USA
- Zip Code: 73145
- Record
- SN06726145-F 20230625/230623230113 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |