Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 03, 2023 SAM #7858
SOLICITATION NOTICE

Z -- Basin 3 & 4 Flocculation & Sedimentation Improvements - Washington Aqueduct - Washington DC

Notice Date
6/1/2023 6:26:36 AM
 
Notice Type
Presolicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
W2SD ENDIST BALTIMORE BALTIMORE MD 21201-2526 USA
 
ZIP Code
21201-2526
 
Solicitation Number
W912DR23B0015
 
Response Due
6/15/2023 8:00:00 AM
 
Archive Date
06/30/2023
 
Point of Contact
Tiara Davis, Ryan Fernandez
 
E-Mail Address
tiara.s.davis@usace.army.mil, ryandale.r.fernandez@usace.army.mil
(tiara.s.davis@usace.army.mil, ryandale.r.fernandez@usace.army.mil)
 
Description
US ARMY CORP OF ENGINEERS - BALTIMORE DISTRICT intends to issue an invitation for bid for a firm-fixed price contract.�� The project consists of implementing upgrades and improvements to the four flocculation and sedimentation basins and ancillary supporting structures and utilities to include, but not limited to: a. Installation of new transformers and switchgears. b. Structural concrete repairs including concrete spall repairs and sealing of joints and cracks in all four basins.� c. Modifications to existing structural framing and metal stairs within existing stairwells. d. Replacement of twelve horizontal flocculator assemblies with new stainless steel flocculators in Basins 3 and 4.� e. Installation and integration of Adjustable Speed Drive (ASD) systems for flocculator control in Basins 3 and 4. f. Improvement of the existing custom hose less residuals vacuum collection systems in Basins 3 and 4. g. Replacement of the existing basin flush water piping systems in Basins 3 and 4. h. Installation of above and below grade ductile iron and stainless steel liquid process pipe, and valves.� Major constraints of this project include the following: a. All work is being performed at an operational water treatment plant that must remain in service at all times. b. The Basins 3 and 4 can only be taken out of service during the winter low season of November to March which must be coordinated with other outage needs at the treatment plant. The basins cannot be taken out of service simultaneously. All work needing to be performed inside the basins must be completed within that time frame. c. The basin intermediate slab surfaces and walkways have limited weight restrictions.� d. Access into the lower level portions (including flocculators and residuals collectors) of Basins 3 and 4 is limited. e. The worksite is a secure facility with specific access and personnel requirements. The anticipated construction duration is�August 15, 2023 thru August 14, 2026.� The magnitude of construction is between $10,000,000 and $25,000,000.� The invitation for bid will be uploaded to the Procurement Integrated Enterprise Environment (https://piee.eb.mil) and www.sam.gov on or about 15 June 2023.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/fa557a356047443c9c63025c560455f7/view)
 
Place of Performance
Address: Washington, DC 20016, USA
Zip Code: 20016
Country: USA
 
Record
SN06701238-F 20230603/230601230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.