Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 27, 2023 SAM #7851
SOLICITATION NOTICE

16 -- Remanufacture of B-1B Electro-mechanical Actuator, Roll Trim Actuator

Notice Date
5/25/2023 11:26:18 AM
 
Notice Type
Solicitation
 
NAICS
336413 — Other Aircraft Parts and Auxiliary Equipment Manufacturing
 
Contracting Office
FA8118 AFSC PZABB TINKER AFB OK 73145-3303 USA
 
ZIP Code
73145-3303
 
Solicitation Number
FA8118-23-R-0024
 
Response Due
6/26/2023 1:00:00 PM
 
Archive Date
07/11/2023
 
Point of Contact
Brenda Smith, JOHN FREEMAN, Phone: 4057397770
 
E-Mail Address
brenda.smith.27@us.af.mil, john.freeman.16@us.af.mil
(brenda.smith.27@us.af.mil, john.freeman.16@us.af.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
THREE?YEAR BASIC AND 1 TWO?YEAR OPTION PERIODS) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS CONTEMPLATED. IT IS ANTICIPATED THAT PRICING OF THIS ACTION WILL BE BASED ON ADEQUATE PRICE COMPETITION;� THEREFORE, OFFERORS ARE NOT REQUIRED TO SUBMIT CERTIFIED COST OR PRICING DATA AT THE TIME OF� PROPOSAL. HOWEVER, IF AFTER RECEIPT OF PROPOSALS, IT IS DETERMINED THAT ADEQUATE PRICE COMPETITION� DOES NOT EXIST, CERTIFIED COST OR PRICING DATA WILL BE REQUIRED. (a) �A Pre?Award Survey and/or Initial Production Evaluation (IPE) is required. Details are�provided in Appendix A, paragraphs 1.2 and 1.3 respectively. (b) �The contractor shall furnish all material, plant facilities, labor, parts, equipment, and�expertise necessary to perform the remanufacture required to restore the end item to a like?new�condition. �The contractor shall also accomplish ALL necessary packing and preservation and� packaging. ALL work shall be completed in accordance with the requirements specified herein� (including attachments hereto) and at the unit price(s) established at the time of award. (c) �Qualification requirements apply. Interested vendors that have not been previously qualified�for this acquisition must submit a Source Approval Request (SAR) package to the Source Development,�Small Business Office @ 405?739?7243. As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to�provide a potential offeror with an opportunity to demonstrate its ability to meet the standards�specified for qualification. (d) �In order to receive any technical data related to this acquisition, offerors must send an�email request to John Freeman at john.freeman.16@us.af.mil. �Release of any data is subject to�applicable data rights. �The request shall include the applicable solicitation number, the specific�data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form,� including instructions for completing the form, is available at:�http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. �The Government is�not responsible for incomplete, misdirected, or untimely requests.** In order to receive drawings contractors will need to request all needed drawings through the�JEDMICS website: https://jedmics.af.mil/webjedmics/index.jsp. Contractors who need an account will�need to complete the instructions at the following link:�https://jedmics.af.mil/webjedmics/splash/training/NEWCTR2875.pdf (e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the� Schedule as �estimated� or �maximum� will not entitle the contractor to any equitable adjustment in�price under the Government Property clause of the contract. (f) END ITEMS BEYOND REMANUFACTURE ""Reparable End Items"" are defined as end items which can be restored to a serviceable condition, in�accordance with applicable requirements. Some units of items listed in Section B may, upon�disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work�Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to� determination that such equipment is beyond these limits, shall be included in the unit price(s) of�the listed item(s). (g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the�Contractor shall promptly notify the administrative contracting officer in writing and shall not�perform further overhaul on any such items except at the direction of the administrative�contracting officer (ACO). Upon written confirmation from the ACO that a particular item is not�reparable, the contractor shall dispose of the unit in the manner directed by the ACO. Contractors are cautioned that until a contract is executed, any effort performed in support of the�anticipated effort is performed strictly at their own risk and expense. There is no authorization�to begin performance until the contractor has received a duly authorized contract signed by the�Contracting Officer. Also, this request for proposal is not to be construed to mean that the award� of a contract is assured, as the availability of funds, timely submission of all requested�documents, and acceptance by both parties are prerequisite to any contract award. (h) Condemned units shall not be counted as production. (i) In the event there are component part(s) with long lead times, the awardee is responsible for�securing necessary parts to meet the Government�s required delivery schedule. (j) In the event that DFARS clause 252.217?7001, Surge Option, is invoked, quantities and prices�will be negotiated at that time. The fill?in data in Clause 252.217?7001 will be TBD until a surge�is known and negotiations are necessary. (k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211?7003.�Contractor determined location and method of marking is acceptable. (l) �Dates listed in clauses 252.216 7006, 52.216?19 and 52.216 21 are based on the estimated award�date. These dates will be revised prior to award based on the actual award date. (m) �Some units of items listed in Section B may, upon disassembly and/or inspection, be determined�to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. �Any cost for work performed by the ractor prior to determination that such equipment is beyond these limits, shall be included in the�unit price(s) of the listed item(s). �
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/bc96ae98aa8e450e8371167c0ed5ab9a/view)
 
Record
SN06694659-F 20230527/230525230113 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.