Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 27, 2023 SAM #7851
SOLICITATION NOTICE

F -- Ott Story Superfund Site Operable Unit #2 Groundwater Remedy Phase I

Notice Date
5/25/2023 11:19:07 AM
 
Notice Type
Solicitation
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
W072 ENDIST DETROIT DETROIT MI 48226-5000 USA
 
ZIP Code
48226-5000
 
Solicitation Number
W911XK23B0003
 
Response Due
6/27/2023 11:00:00 AM
 
Archive Date
07/11/2023
 
Point of Contact
Michelle Barr, Phone: 3132262767, Lisa May, Phone: 3132263189
 
E-Mail Address
michelle.barr@usace.army.mil, Lisa.M.May@usace.army.mil
(michelle.barr@usace.army.mil, Lisa.M.May@usace.army.mil)
 
Awardee
null
 
Description
Environmental Remediation Services Construction project to implement system upgrade recommendations for theOtt Story Superfund Site Operable Unit #2 Groundwater Remedy in Muskegon (Dalton Township), Michigan. Thedesign is intended to improve the effectiveness of the collection system to maintain contaminated groundwaterplume capture and contaminant mass removal for the OU1/OU2 remedy. The work includes the followingmajor items:a. Install new extraction wells, associated appurtenances, and connect to existing system. New wells are numberedto coordinate with existing wells: EW-2a, EW-3a, EW 4a, EW-5a, EW-6b.b. Installation of three new rehabilitation wells at each new EW location (total of 15 wells) to allow for chemicalrehabilitation of the well and aquifer immediately surrounding the well.c. Installation of below grade electrical conduit within concrete ductbank from each new EW location back to thecontrol panel.d. Installation of above-ground weatherproof enclosures for each new extraction well piping and flow measurementequipment.e. Upgrade and replace existing manifold piping and appurtenances in below grade EW vaults (EW-1, EW-2, EW-3,EW-4, EW-5, EW-7, EW-8 and EW-9) with PVC materials (3 inch diameter).f. Replace all system flow meters with consistent make/model.g. Install pressure gauges on collection lines E and F in Valve Vaults 1, 2 and 3. There are no existing gauges in thevaults. No comm or power wiring for gauges is required.h. Install new standby back-up power generation and control for the new well extraction well network.i. Upgrade controls infrastructure to allow remote monitoring of the expanded well extraction well network.j. Complete monitoring well abandonment actions to optimize the existing well network.All pre-field planning documents to include the Accident Prevention Plan, Health and Safety Plan, Well InstallationPlan, Work Plan, Quality Control (QC) Plan, and Environmental Protection Plan must be approved by theContracting Officer before construction work begins.Please note that some well locations may require 72 hour prior notice before being granted access to the site.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d574a90bd6e04670a9384edda16ec12f/view)
 
Record
SN06694272-F 20230527/230525230110 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.