Y -- Maintenance Dredging of Shrewsbury River, New Jersey Federal Navigation Channel - Upland

Notice Date
5/16/2023 7:04:31 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS23B0017
 
Response Due
5/31/2023 11:00:00 AM
 
Point of Contact
Nicole C. Fauntleroy, Phone: 9177906139, Nicholas P. Emanuel, Phone: 9177908069
 
E-Mail Address
nicole.fauntleroy@usace.army.mil, nicholas.p.emanuel@usace.army.mil
(nicole.fauntleroy@usace.army.mil, nicholas.p.emanuel@usace.army.mil)
 
Description
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of the Shrewsbury River, New Jersey Federal Navigation Project. �The dredged material would be dredged and subsequently transported to and placed at a contractor furnished, state permit upland placement site(s). The proposed maintenance dredging would remove approximately 50,000 cubic yards of selected critical shoals from the silty/clay areas in the North and South Branches of the Shrewsbury River Federal Navigation Project. Dredging would be required to depths of -8 feet Mean Lower Low Water (MLLW) plus 1 feet of allowable overdepth and -6 feet MLLW plus 1 feet of allowable overdepth. �The dredged material is expected to consist primarily of silt/clay. It is recommended that the proposed work only be performed by utilizing a mechanical dredge with a clamshell bucket. �Additionally, multiple, ocean-going barges and tug boats will be needed to perform the work during the dredging, transport and unloading operations. �The dredged material would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. �All necessary permits required for the dredged material placement will be provided by the contractor to the government. The apparent low bidder shall, within 35 calendar days from the date the apparent low bidder is notified of being such, provide copies of all required permits and approvals for transportation, transfer, dewatering, processing and final placement of the dredged material for the upland placement portion of the project, and shall submit evidence of such permits and approvals to the government. �Bidders should consult the specifications for all submittal requirements. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 2,000 cubic yards per calendar day for the dredging, transportation, transfer, dewatering, processing, and final placement of the material. �The presence of dredging equipment in the channel will impact ship traffic and it is necessary to maintain this production rate while minimizing the duration of this impact. The proposed work is anticipated to take place between in the fall/winter of 2023/2024. �The work is estimated to cost between $5,000,000.00 and $10,000,000.00. Liquidated Damages of $2,695.00 per calendar day of delay will be assessed to the contractor until all work under the contractor is accepted as complete.� This is an unrestricted Procurement. �
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/8454b35a313542e0b1a9c9d84ddb857b/view)
 
Record
SN06683877-F 20230518/230517212022 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.