Y -- MOTCO Wharf 2 East Trestle Repairs

Notice Date
5/11/2023 3:19:14 PM
 
Notice Type
Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
 
ZIP Code
95814-2922
 
Solicitation Number
W9123823R0021
 
Response Due
5/31/2023 2:00:00 PM
 
Archive Date
06/14/2023
 
Point of Contact
Howard Gregory, Phone: (916) 557-5217, MELISSA DENIGRIS, Phone: 916-557-5137
 
E-Mail Address
howard.e.gregory@usace.army.mil, MELISSA.A.DENIGRIS@USACE.ARMY.MIL
(howard.e.gregory@usace.army.mil, MELISSA.A.DENIGRIS@USACE.ARMY.MIL)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Awardee
null
 
Description
***** 11 May 2023 #2: the purpose of this announcement is to add the site visit photographs from today's site visit ***** ***** 11 May 2023: the purpose of this announcement is to add the Site Visit Sign In Sheet from today's site visit ***** MOTCO Wharf 2 East Trestle Repairs. The scope of the Wharf 2 East Trestle Comprehensive Repairs project includes: 1) Repair of existing spall damage to concrete structure. Spalls include open, exposed rebar, and closed spalls. Spalls must be cleaned and prepped to clean concrete, then repaired/patched. 2) Strengthening modification of the trestle decking. Strengthening is to be accomplished by the addition of concrete in-fill beams to the southernmost lane of travel at approximately 50 stations. Infill beams will be joined to the existing structure with rebar joiners and concrete grouting. 3) Replacement of deteriorated light poles providing overhead illumination to the east trestle. Six light poles are to be replaced due to structural deterioration of the steel light poles and concrete bases. Replacement includes new light poles, new mounting bases or modifications to the existing bases, fixtures, and required electrical work to energize the light fixtures. The majority of the work will take place over water underneath the deck structure. The over water work window will be tidal influenced and limited to 6 ? 8 hours per day.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/8a04b24eee3f42069df770cb139029bd/view)
 
Record
SN06679591-F 20230513/230511230108 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.