Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 06, 2023 SAM #7830
SOURCES SOUGHT

J -- Boiler Tuning & Fan Balancing

Notice Date
5/4/2023 12:40:55 PM
 
Notice Type
Sources Sought
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
245-NETWORK CONTRACT OFFICE 5 (36C245) LINTHICUM MD 21090 USA
 
ZIP Code
21090
 
Solicitation Number
36C24523Q0602
 
Response Due
5/11/2023 12:00:00 PM
 
Archive Date
05/18/2023
 
Point of Contact
Tracy Dotson, Contract Specialist, Phone: (304) 429-6755
 
E-Mail Address
tracy.dotson@va.gov
(tracy.dotson@va.gov)
 
Awardee
null
 
Description
Page 10 of 13 STATEMENT OF WORK Semi-Annual Tuning Service for Fire Tube Boilers General Scope: This project consists of testing, inspecting, checking, and adjusting combustion gas and oil settings on Scotch Marine Boilers (3 Each) at VAMC Beckley, WV, per IAW Boiler Safety Device Testing Manual, 7th Edition (January 2023), and VHA Directive 1810 (January 2023). This is a base year +4 optional year(s) contract. This is a semi-annual service that requires multi-day trips to complete boiler tuning service. This exercise requires a certified Fireye Burner controls installer/repair technician. Technician must follow recommended test procedures prescribed by BEI Safe Steaming Device Testing Manual 7th Edition. Check low water cutoff alarm system. Check low water shunt switch. Check auxiliary low water cutoff alarm system. Check auxiliary low water shunt switches. Check high and low water alarms. Check high steam pressure cutouts. Check steam safety valves (x2) each boiler. (Lift pressures are 120psi and 125psi per boiler.) Check flame scanner. Check high and low gas pressure switches, adjust if necessary. Check high and low oil switches, adjust if necessary report final settings. Check all combustion air switches and purge switches, adjust if necessary. Adjust burner combustion settings and calibrate oxygen trim on each fire tube boiler. Perform Yearly accumulation test on each boiler Check all gas vents for leaks. Check gas fuel safety shut off valves proof of closure. Check fuel oil safety shut off valves proof of closure. Check operation of Liquid Petroleum Gas Pilot. Check Low Oxygen alarm and/or cutout. 19. Check vibration of burner fans semi-annually at each tuning. Check, Adjust, and Record (on final report) timing parameters for (Pre-purge, Post-purge, Ignitor, Main Flame Ignition, and Flame Out). Calibrate instrumentation, monitoring, and control systems. Check Furnace pressure Check Combustion gas leaks into boiler room. Calibrate and Test O2 monitoring system for entire boiler plant, adjust as necessary for tuning purposes, provide calibration documentation along with tuning documentation. Provide site visit reports documenting all discrepancies, adjustments, and final settings of tuned, calibrated, and adjusted parameters. Place of Performance: Tasks will be performed in the boiler plant at the VAMC Beckley, WV in accordance with VA Master Specifications. Work will be in an occupied healthcare facility in operation 24 hours a day and care must be provided to keep work areas clean and contained. *The contractor will be responsible for storage of materials and disposal of all unused materials. **The contractor will ensure that all sub-contractors meet and abide by all government regulations and requirements to include 30 hour OSHA training for superintendent and 10 hour OSHA training for workers.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/f89310f6a6934963bd905adf976853b5/view)
 
Place of Performance
Address: Beckley VA Medical Center 200 Veterans Ave, Beckley, WV 25801, USA
Zip Code: 25801
Country: USA
 
Record
SN06672921-F 20230506/230504230123 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.