SAMDAILY.US - ISSUE OF APRIL 27, 2023 SAM #7821
SOLICITATION NOTICE

Y -- Maintenance Dredging of Browns Creek, NY Federal Navigation Project

Notice Date
4/25/2023 8:35:07 AM
 
Notice Type
Presolicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST NEW YORK NEW YORK NY 10278-0004 USA
 
ZIP Code
10278-0004
 
Solicitation Number
W912DS23B0014
 
Response Due
5/10/2023 11:00:00 AM
 
Point of Contact
Nicole C. Fauntleroy, Phone: 9177906139, Nicholas P. Emanuel, Phone: 9177908069
 
E-Mail Address
nicole.fauntleroy@usace.army.mil, nicholas.p.emanuel@usace.army.mil
(nicole.fauntleroy@usace.army.mil, nicholas.p.emanuel@usace.army.mil)
 
Description
The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of portions of the Browns Creek, New York, Federal Navigation Project. The dredged material would be subsequently placed at the adjacent upland Confined Disposal Facility (CDF). The proposed maintenance dredging would remove approximately 52,000 cubic yards (CY) of selected critical shoals from the channel. Dredging in this channel would be required to depths of -6 feet Mean Lower Low Water (MLLW) plus 2 foot allowable overdepth in the 6 ft. channel, and -4 feet MLLW plus 2 foot allowable overdepth in the 4 ft. channel. The dredged material is expected to consist primarily of silt and sand. The proposed work is anticipated to be performed utilizing a hydraulic cutterhead dredge. Additionally, multiple scows and tugboats will be needed to perform the work during the dredging and placement operations. The CDF may require some rehabilitation with heavy equipment to prepare it to accept dredge material. The dredged material would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located. Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the notice to proceed and maintain an integrated production rate of at least 1,000 cubic yards per calendar day for the dredging and placement of the material. The presence of dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact. The proposed work is anticipated to take place in the summer/fall/winter of 2023. The work is estimated to cost between $1,000,000 and $5,000,000. Liquidated damages of $2,530.00 per calendar day of delay will be assessed to the contractor until all work under the contract is accepted as complete. This is an unrestricted procurement. �
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/60a2f02c474b4b09bfeb67bb149a0639/view)
 
Record
SN06661586-F 20230427/230425230114 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.