Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF APRIL 20, 2023 SAM #7814
SOLICITATION NOTICE

Z -- GMNF FR59-4.9 Culvert Replacement

Notice Date
4/18/2023 1:39:17 PM
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
USDA FOREST SERVICE-SPOC EAST Washington DC 202500001 USA
 
ZIP Code
202500001
 
Solicitation Number
12441923B0003_Synopsis_Pre-Solicitation_Notice
 
Response Due
5/5/2023 2:00:00 PM
 
Archive Date
05/06/2023
 
Point of Contact
Michael Winstead, Phone: 8643996465
 
E-Mail Address
michael.winstead@usda.gov
(michael.winstead@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
SCOPE OF CONTRACT The Forest Road 59 � 4.9 Culvert Replacement Contract work shall include, but is not limited to, excavation, removal of existing culvert, layout and construction of the plate arch, construction of concrete substructures, stream simulation, roadway reconstruction, and approach work. The Contractor shall utilize a Government-furnished plate arch. The Contractor shall furnish all new hardware for the plate arch. See Attachments 2 and 5 for additional details. The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Work in accordance with the Specifications referenced below. PROJECT LOCATION FR59 � 4.9 culvert is located in the Green Mountain National Forest in Ripton, VT, 05766 in Addison County. MAGNITUDE OF CONSTRUCTION PROJECT Per FAR Subpart 36.204, the anticipated price range of this project is between $250,000 and $500,000. TECHNICAL SPECIFICATIONS The U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and its revisions are included by reference only (see Attachment 3).� Also applicable, but not listed, is any other section or subsection of the included Specification(s) or any specific standard or specification referenced therein.� The requirements contained in these specifications are hereby made a part of this Invitation for Bid and any resulting contract. FP-14 can be downloaded directly from the following website free of charge:��https://highways.dot.gov/federal-lands/specs. Please note, it is the responsibility of the Contractor to verify they are using the current version. In addition to the specifications referenced above, the Forest Service Supplemental Specifications (FSSS) are revisions to the Standard Specifications (FP-14) that incorporate changes and/or additions that are specific requirements unique to this particular project also apply (see Attachment 4).� The applicable Wage Determination is VT20230048 (see Attachment 6). KEY DATES Tentative date for issuing the Invitation for Bid is 05/05/2023. Tentative date for opening bids is 05/23/2023. Project must be completed by 10/31/2024.�� The solicitation and all supporting documents will be posted on this website (SAM.gov) free of charge. ATTACHMENTS Attachment 1 - Reserved Attachment 2 - Plate Arch Assy and Install Manual_For Information Only Attachment 3 - DOT-FHA Standard Specifications for Construction of Roads and Bridges (FP-14) Attachment 4 - GMNF FR10-10.4 Culvert Replacement_FSSS_3.30.2023 Attachment 5 - GMNF FR59-4.9 Culvert Replacement_Plans Attachment 6 - Davis-Bacon Act WD VT20230048
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/94cb45ef281c450d8023fe041f3f122d/view)
 
Place of Performance
Address: Ripton, VT 05766, USA
Zip Code: 05766
Country: USA
 
Record
SN06654214-F 20230420/230418230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.