SOLICITATION NOTICE

Z -- Fort Peck Butterfly Valve Rehabilitation Powerhouse 2

Notice Date
3/3/2023 12:58:07 PM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W071 ENDIST OMAHA OMAHA NE 68102-4901 USA
 
ZIP Code
68102-4901
 
Solicitation Number
W9128F23R0009
 
Response Due
3/30/2023 12:00:00 PM
 
Archive Date
04/14/2023
 
Point of Contact
Lynne D. Reed, Phone: 4029952039, Daniel D. Monahan
 
E-Mail Address
lynne.d.reed@usace.army.mil, daniel.d.monahan@usace.army.mil
(lynne.d.reed@usace.army.mil, daniel.d.monahan@usace.army.mil)
 
Description
***Notice - Document Files issues have been resolved. Please reach out to me if there is still having issues opening the documents - thank you Lynne*** ***Notice ~ there is a known issues with the uploaded Specification and Drawing documents. We are working to resolve the issues.� No need to send me an email. will provide an update as soon as we have the documents. Thank you Lynne Reed*** On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non�destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion.� The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs.� The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project.� Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement.� **NOTE**�Bidder Inquiry is open when the Solicitation is posted.**�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d78449e34795442797fcac56799d211e/view)
 
Place of Performance
Address: Fort Peck, MT 59223, USA
Zip Code: 59223
Country: USA
 
Record
SN06608132-F 20230305/230304211928 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.