Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF FEBRUARY 24, 2023 SAM #7759
SOURCES SOUGHT

99 -- REPAIR & CERTIFY CRYOGENIC LIQUID CYLINDER DEVICES

Notice Date
2/22/2023 6:43:26 AM
 
Notice Type
Sources Sought
 
NAICS
332420 — Metal Tank (Heavy Gauge) Manufacturing
 
Contracting Office
SRNS - DOE CONTRACTOR Aiken SC 29801 USA
 
ZIP Code
29801
 
Solicitation Number
SRNS02222023REPAIRCYROGENICLIQUIDCYLINDERS
 
Response Due
3/16/2023 2:00:00 PM
 
Point of Contact
Barbara McCarty, Phone: 8039526119
 
E-Mail Address
barbara.mccarty@srs.gov
(barbara.mccarty@srs.gov)
 
Description
***** This is a REQUEST FOR INTEREST ONLY! This request does not constitute a request for proposal, request for quote, or invitation for bid. The intent of this request is to identify potential offerors for market research purposes only. ***** Request for Information (RFI) Savannah River Nuclear Solutions, LLC (SRNS), which manages and operates portions of the Savannah River Site (SRS) under a Department of Energy (DOE) prime contract, solicits expressions of interest from potential suppliers with the experience and capability to repair and certify cryogenic liquid cylinder devices. ���� This RFI is issued to assist with finding potential suppliers interested in this solicitation. SRNS seeks the following services: Provide transportation of devices and their inspection, repair and testing services for Savannah River Nuclear Solutions (SRNS) cryogenic liquid cylinders (dewars) according to manufacturer�s specifications. Subcontractor shall provide all material and labor necessary to evaluate, repair, and test the cylinders. Repair shall include the following tasks: 1.� Vacuum: Mass spec and then evacuate for 72 hours (pull vacuum to 2 microns or� less). 2.� Top works: Remove all parts. Test all safety devices and regulators. Replace parts if necessary. Clean and polish parts that are reusable. 3.� �Performance: Cylinder is filled with liquid nitrogen for testing to assure cylinder is functioning properly. Cylinder shall meet the Normal Evaporation Rate (NER) in the original manufacturer's specifications. 4.� �Appearance: Blast and paint carbon steel cylinders. Polish and buff stainless-steel cylinders. Nameplates and SRNS specific labels shall not be cleaned from the dewars. 5.� Quality Assurance: Perform final Quality Control check and sign off on each cylinder prior to return shipment. Provide proof of quality control via documentation. 6.� Certification: Provide certification that repairs and testing are sufficient to meet the DOT criteria as found at �49 CFR 180.211 Repair, rebuilding and reheat treatment of DOT-4 series specification cylinders�� A supplier's response to the RFI does not guarantee they will be selected to participate in the RFP. Suppliers responding to this RFI shall include evidence of the following: Past performance/personnel qualifications Facility to perform repair, repair location Standard turn-around time Template of post-repair certificate E-mail response addressing Items 1 through 4 above shall be submitted by 5:00 p.m. est. on March 16, 2023 to Barbara McCarty at barbara.mccarty@srs.gov.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/0bb63be63fde4345b53047360d7e2c1e/view)
 
Place of Performance
Address: Aiken, SC 29808, USA
Zip Code: 29808
Country: USA
 
Record
SN06598984-F 20230224/230222230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.