SOLICITATION NOTICE
Z -- Hydraulic System Replacement, Pike Island Locks and Dam
- Notice Date
- 11/22/2022 12:33:54 PM
- Notice Type
- Solicitation
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- US ARMY ENGINEER DISTRICT PITTSBURG PITTSBURGH PA 15222-4198 USA
- ZIP Code
- 15222-4198
- Solicitation Number
- W911WN23B8005
- Response Due
- 12/15/2022 8:00:00 AM
- Archive Date
- 11/22/2023
- Point of Contact
- MICHAEL BOYD, Phone: 4123957114
- E-Mail Address
-
michael.w.boyd@usace.army.mil
(michael.w.boyd@usace.army.mil)
- Small Business Set-Aside
- SBA Total Small Business Set-Aside (FAR 19.5)
- Awardee
- null
- Description
- The U.S. Army Corps of Engineers, Pittsburgh District, has a project that involves the replacement of the central hydraulic system for the Main and Auxiliary Lock Chambers at Pike Island Locks and Dam, Ohio River, West Virginia. The contract will include a new four-corner hydraulic system for each lock chamber consisting of Hydraulic Power Units (HPUs) for the miter gates and culvert filling/emptying valves. The new HPUs shall be located in new precast buildings at the following locations: ?Two (2) HPUs on the river wall; one upstream and one downstream for operation of the Main Chamber culvert valves and miter gates. ?Two (2) HPUs on the middle wall; one upstream and one downstream for operation of Main Chamber culvert valves and miter gates. In addition, the two HPUs on the middle wall are for operation of the Auxiliary Chamber miter gates. The modified four-corner system reduces the number of HPUs on the middle wall from four to two. ?Two (2) HPUs on the land wall; one upstream and one downstream for operation of the Auxiliary Chamber culvert valves and miter gates. The contract specifically includes: a.Installation of new power, control, and fiber optic cables for the six (6) HPUs. Includes modifying the existing control stations in each control shelter for the addition of the new HPUs and miter gate controls. Includes installation of a new operator control station in the middle wall Operations Building. b. Furnishing and installation of six (6) HPUs, stainless steel hydraulic piping, and hydraulic oil. c. Furnishing and installation of six (6) precast buildings which includes raised concrete pads, power distribution equipment, associated electronics and hardware, and new utility trench covers in various areas of the lock. d. Furnishing and installation of new Motor Control Center (MCC) distribution equipment. e. Demolition and disposal of existing central hydraulic system located in the middle wall Operations Building. This includes all motors, pumps, reservoir, filters, associated piping, and proper disposal of hydraulic oil. f. Demolition and removal of all existing central hydraulic oil lines on the river, middle, and land walls. This includes all lines for pressure and return to each miter gate and culvert valve cylinder. Removal and proper disposal of hydraulic oil and components will be required. Removal and proper disposal of electrical equipment will be required. Ferrous and all other construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable. Construction work will occur in close proximity to waterway traffic and operating lock and dam gates. The existing lock chambers and dams are currently operated and staffed by Government personnel 24 hours a day 365 days of the year. Lock closures for installation and testing of new equipment will be required to be minimal and at the approval of Government. *Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911WN23B8005' to obtain more details.*
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/b47083bf144f42c496af6fdd4e3275ad/view)
- Record
- SN06525896-F 20221124/221125065243 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |