Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF NOVEMBER 18, 2022 SAM #7658
SOLICITATION NOTICE

R -- Geotechnical AST Drilling Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC)

Notice Date
11/16/2022 4:21:45 PM
 
Notice Type
Presolicitation
 
NAICS
541360 — Geophysical Surveying and Mapping Services
 
Contracting Office
US ARMY ENGINEER DISTRICT SACRAMENT SACRAMENTO CA 95814-2922 USA
 
ZIP Code
95814-2922
 
Solicitation Number
W9123823R0008
 
Response Due
12/1/2022 2:00:00 PM
 
Point of Contact
Ronald Arbour, Phone: 9165575169, Michelle Spence
 
E-Mail Address
ronald.p.arbour@usace.army.mil, michelle.a.spence@usace.army.mil
(ronald.p.arbour@usace.army.mil, michelle.a.spence@usace.army.mil)
 
Description
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates solicitation of a requirement for construction services to be performed in support of the Geotechnical and Drilling Services at Sacramento, California. The project is anticipated to require Provide drilling, cone penetrometer testing services, backhoe, and trackhoe excavations. The principle features of the work shall include, but are not limited to: soil drilling and sampling using Hollow Stem flight augers, solid Stem flight augers, mud-rotary, air-rotary, and percussion drilling methods (such as ODEX, Down-hole Casing Advance Systems, or other percussion drilling systems); sonic drilling and sampling; rock core drilling and sampling (up to 6-inch diameter) using wire-line or conventional, diamond-impregnated drill bits; soil sampling using standard penetrometers, and other split barrel samplers up to 3-inch outside diameter (O.D.); undisturbed soil sampling using Shelby push tubes and Pitcher barrels with Pitcher tubes; test-pit excavations utilizing backhoes and trackhoes; Cone Penetrometer Testing (CPT) and associated tests using CPT; piezometer and inclinometer installations; hydraulic pressure testing (water pressure testing) associated with rock core drilling; observation well installation and development (includes pump tests and permeability tests); percolation tests; preparation of drill logs and trench or test-pit logs; as-built diagrams for observation well(s), piezometer(s), and inclinometer(s) installations, and all other pertinent records. The Contractor shall provide all labor, material, equipment, and supervision to perform the work set forth in Task Orders provided by the Government. A U.S. Army Corps of Engineers� (USACE) Geologist or Geotechnical Engineer will oversee all work, but on occasion, the Contractor will have to provide the services of a Geologist or Geotechnical Engineer as described above. If the Contractor is required to supply a Geologist or Geotechnical Engineer, then the USACE will supply all soil and rock logging forms and materials as well as specific directions on how to achieve precise and accurate soil or rock core logs. For projects requiring more than two drill rigs at the same time, the Contractor shall provide the services of a drill foreman to coordinate all field activities. For Projects in excess of $200,000 in value, projects requiring more than 10 personnel, projects utilizing more than one subcontractor, or projects that�include special hazards, the Contractor shall provide a separate full-time Health and Safety Officer to oversee safety of personnel during project activities
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/d8dbddef510540a4ba982bb5a45d4a14/view)
 
Place of Performance
Address: CA, USA
Country: USA
 
Record
SN06519284-F 20221118/221116230103 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.