SOLICITATION NOTICE
H -- Triennial Electrical System Maintenance and Inspection
- Notice Date
- 10/19/2022 8:35:57 AM
- Notice Type
- Combined Synopsis/Solicitation
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- 250-NETWORK CONTRACT OFFICE 10 (36C250) DAYTON OH 45428 USA
- ZIP Code
- 45428
- Solicitation Number
- 36C25023Q0050
- Response Due
- 10/25/2022 10:00:00 AM
- Archive Date
- 12/24/2022
- Point of Contact
- Mary Jane Crim, Contracting Officer, Phone: 937-268-6511
- E-Mail Address
-
maryjane.crim@va.gov
(maryjane.crim@va.gov)
- Small Business Set-Aside
- SDVOSBC Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Awardee
- null
- Description
- The purpose of this solicitation amendment is to provide answers to vendor questions and extend the close date and time for the solicitation. Please see questions and answers below. The due date and time are hereby extended from October 19, 2022 at 4PM EST to October 25, 2022 at 1PM EST. It was stated on the site visit this is requesting a total of 1 IR scan. Please confirm. - 1 IR scan It was stated on the site visit that this work is to take place by the end of 2022. Please confirm. - Correct The drawings provided do not exactly match the equipment list in the solicitation. Are we to bid from the drawing package or the equipment list? Please use the equipment list It is stated in the RFP that outages are 12 hours but during the site visit they stated the outage can be no longer than 7 pm to 6 am. Please confirm outage windows. 7pm 6am, Mon - Sun It was stated on the site walk that the paralleling gear in the energy center could be maintained on straight time. Can an updated schedule be clarified? Per the RFP, all maintenance work was to be conducted off hours.- Work to be conducted off hours (7pm- 6am), but we will try to accommodate work to be done during normal hours as needed It was stated on the site walk that NPSS1 750kVA transformer, breakers, relays, and associated NPSS1 1600A MSB could be tested on straight time(normal working hours). Could an updated maintenance schedule be clarified? Per the RFP, all maintenance work was to be conducted off hours. - Work to be conducted off hours (7pm- 6am), but we will try to accommodate work to be done during normal hours as needed When will the current arc flash study be completed and stickers applied to the equipment? Arc flash study completed. However, stickers have not been applied. We will share the arc flash study report when the contract is awarded Please confirm that outages can be taken from 7pm to 6am Monday through Friday, as it was discussed on the site walk. Outages will be 7pm 6am, Mon - Sun Due to these RFI questions, is it possible to get a bid date extension? - Yes Mary Jane Crim Contracting Officer maryjane.crim@va.gov
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/7f037e5a09c34dca8ad93bf0e6d89073/view)
- Place of Performance
- Address: Chalmers P. Wyllie VA Ambulatory Center 420 North James Road, Columbus 43219
- Zip Code: 43219
- Record
- SN06497550-F 20221021/221019230053 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |