Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF OCTOBER 07, 2022 SAM #7616
SOLICITATION NOTICE

Z -- RPM Installation - Sweet Grass MT, Pembina ND, Portal ND

Notice Date
10/5/2022 1:19:46 PM
 
Notice Type
Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
PBS CENTRAL OFFICE WASHINGTON DC 20405 USA
 
ZIP Code
20405
 
Solicitation Number
47PA0322R0021
 
Response Due
10/11/2022 2:30:00 PM
 
Archive Date
10/26/2022
 
Point of Contact
Overton Spence, Phone: 720.442.1389, Aaron Lay, Phone: 951.809.0541
 
E-Mail Address
overton.spence@gsa.gov, aaron.lay@gsa.gov
(overton.spence@gsa.gov, aaron.lay@gsa.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
UPDATE 05 OCTOBER 2022:�The following attachments have been added to the posting: -47PA0322R0021-0002 Generated PDF with TOC -Solicitation Amendment 47PA0322R0021_0002 -WD ND20220046 (29 Sept) -WD ND20220047 (29 Sept) -CWMD RPM Install West Sites RFIs Final The purpose of this amendment is to incorporate Requests for Information (RFIs) and their responses as well as updated Wage Determinations into the solicitation. The due date and time is not extended. UPDATE 08 SEPTEMBER 2022:� The following documents have been added to the posting: -A solicitation amendment (SF30) which provides information on organized site visits for each location.� -Available answers to current RFIs The proposal deadline has been extended to 11 October 2022 at 4:30 PM Central Time. ORINGAL POSTING The General Services Administration (GSA) has been tasked in supporting the�Customs and Border Protection (CBP) Counter Weapons of Mass�Destruction (CWMD) branch for construction services,�management and oversight for replacing multiple RPM at multiple�Land Ports of Entry (LPOE). The contractor shall provide all�supervision, labor, material and equipment necessary to perform�the RPM replacements. Unique and technically compatible�equipment, such as the RPM replacement, will be provided by CWMD � coordination for reception with the Contractor is key. All�supporting infrastructure associated with RPM replacement shall be�included to make newly installed RPMs fully operational.�Supporting infrastructure can include: Communications Control Box (CCB) with network switch and fiber patch panel, Control Box (CB),�Battery Box (BB), Camera Box, Analysis Computer Station (ACS),�Reutilize existing power supply, install supporting Visual�Identification System Cameras, Field Point Gateway Server in applicable LAN rooms, annunciators in applicable booths, install�applicable monitor computers in appropriate buildings, and�installation of new fiber as required. The contractor shall reuse�applicable and carryover infrastructure as much as possible to reduce overall installation costs to provide best value for the�government. Coordination with local port authorities to maintain operations and minimize construction impact to commercial traffic�flow. �
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/bbc073de9fcd424daabdcd1917d21056/view)
 
Place of Performance
Address: USA
Country: USA
 
Record
SN06487234-F 20221007/221005230111 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.