Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF SEPTEMBER 29, 2022 SAM #7608
AWARD

Z -- DTRA TEAMS Roads Resurfacing

Notice Date
9/27/2022 11:50:54 AM
 
Notice Type
Award Notice
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
W075 ENDIST ALBUQUERQUE ALBUQUERQUE NM 87109-3435 USA
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP22Q0062
 
Archive Date
10/07/2022
 
Point of Contact
Loretta Sanchez, Phone: 5053423210, Francesca M Luna, Phone: 5053423453, Fax: 5053423496
 
E-Mail Address
loretta.d.sanchez@usace.army.mil, francesca.m.luna@usace.army.mil
(loretta.d.sanchez@usace.army.mil, francesca.m.luna@usace.army.mil)
 
Small Business Set-Aside
8AN 8(a) Sole Source (FAR 19.8)
 
Award Number
W912PP22P0046
 
Award Date
09/22/2022
 
Awardee
ALTIMA CONSTRUCTION INC NM 87105-6666 USA
 
Award Amount
248731.71
 
Description
This action was awarded as and 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for DTRA TEAMS Roads Resurfacing. The overall goal of this project is to provide bituminous surface treatments for sections of roadway surrounding the DTRA TEAMS SITE. The bituminous surface treatments proposed include the placement of single bituminous surface treatment (SBST) and double bituminous surface treatment (DBST). Chip seal or Double-Insulated Chip Seal (for multiple passes) are commonly used terms to describe the same process. These treatments are normally used to seal or waterproof the pavement, provide wear resistance, and increase skid resistance. All surface treatments are relatively thin coatings of material and do not add structurally to the pavement. The Contractor shall provide all required elements (material, equipment, labor, etc.) for this project.� A single bituminous surface treatment (SBST) consists of an application of bituminous material on a prepared surface followed immediately by a single layer of cover aggregate. Double bituminous surface treatment (DBST) is similar to a SBST except those two applications of bitumen and cover aggregate are used. The first application of aggregate uses a coarser aggregate than the second application and usually determines the DBST thickness. The second application of aggregate partially fills the surface voids and keys into the aggregate in the first aggregate course.� SBST's and DBST's are used on prepared base courses and on new or old pavements. The DBST�s and more additional layers (third or more) are used to provide greater wearing resistance and some structural strength (minimal). The Contractor is urged and expected to thoroughly inspect the site where construction is to be performed in order to satisfy all parties regarding, all general and local conditions that may affect the total construction and cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site and gather necessary information constitute grounds for a claim after contract award. The Contractor is responsible for completing all work in this scope and any that is reasonably inferred to complete this project such as, but not limited to; Site Prep, Materials, Mix Design, Construction, Site Clean-up and Warranty Info.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ad023cd0d715405e8a71d6f238f0fdf5/view)
 
Place of Performance
Address: Kirtland AFB, NM 87117, USA
Zip Code: 87117
Country: USA
 
Record
SN06479210-F 20220929/220927230115 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.