SOLICITATION NOTICE

Z -- Z--DORM TILE & CARPET REMOVAL PROJECT - SIPI

Notice Date
9/1/2022 9:27:30 AM
 
Notice Type
Solicitation
 
NAICS
238330 — Flooring Contractors
 
Contracting Office
INDIAN EDUCATION ACQUISITION OFFICE Albuquerque NM 87104 USA
 
ZIP Code
87104
 
Solicitation Number
140A2322Q0628
 
Response Due
9/7/2022 11:00:00 AM
 
Archive Date
09/22/2022
 
Point of Contact
Johnson, Mary Jane, Phone: 5058034259
 
E-Mail Address
maryjane.johnson@bie.edu
(maryjane.johnson@bie.edu)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment No.: P00001 is for Solicitation No.: 140A2322Q0628 as follows: To respond to questions received: 1) Bathrooms are not included in scope, correct? Government Response: Correct, bathrooms and shower areas in residential wings are excluded, also bathrooms in isolation rooms and main entrance restrooms are excluded. 2) It was stated a site visit that successful contractor would receive 1 complete wing on 1 floor at a time. Please confirm. Government Response: Contractor will have on Section of a wing per floor. Such as A wing, 1st floor, north section. Possibility of entire 1st floor of the residential wing, but that will be determined if requested and coordinated through resident director and director of student services. 3) Is contractor responsible for moving/disconnect/reconnect of computers/electronics? Government Response: Moving/disconnecting/reconnecting electronics such as computer, monitors, towers etc shall be the responsibility of the SIPI IT and shall be coordinated as such. Furniture, cabinets, etc shall be moved, stored and reinstalled by the contractor 4) Will contractor be allowed to leave furniture in building, and just move around for flooring installation? Government Response: Yes, but items shall be protected from damage while flooring is replaced. 5) Do you have a specification for the desired LVT? Government Response: SIPI Standard commercial LVT is of the Mohawk Group Commercial LVT product line. Contractor shall submit a sample board and conduct a meeting with SIPI stakeholders to determine product size, type, color, location and layout of requested products within each building. 6) In contractor responsible for moving of washers/dryers/appliances? Government Response: Yes, contractor can move appliances within the space to complete work effort unless to be stored to complete which shall be the contractor responsibility. 7) Has existing Resilient Flooring been tested for asbestos? Government Response: Asbestos surveys completed in 2020 for B113 four winds lodge and B114 Golden Eagle Lodge will be provided. 8) Would you please include the list of site visit attendees with your reply? Government Response: see attach, S6 9) One vendor said I had floor plans? Can you send the floor plans to me? Government Response: see attachments (S1 to S5) All other terms and conditions to remain the same __________________________________________________________________________________________________________________________________________________________________________________________________ This solicitation is for a fixed price Construction project and is set aside for Small Business (SB). SOUTHWEST INDIAN POLYTECHNI INSTITUTE (SIPI) - CARPET REMOVAL AND INSTALLATION - SOLICITATION IS SET ASIDE FOR SMALL BUSINESS (SB). Contractors, please see the attached Request for Quote for the SIPI for the removal and installation of the carpet at the school. SITE Visit: Wednesday, August 31, 2022, at 1:00 p.m. Mountain Daylight Time at SIPI in Albuquerque, NM. Garrick Harlon will be at the school on this day to conduct the site visit. Please contact Mr. Garrick Harlon to inform him you will be attending the site visit at Garrick.harlan@bie.edu. QUESTIONS: All questions to be received by Thursday, September 1, 2022, by COB. All questions must be emailed to Mary Jane Johnson before this date and time to maryjane.johnson@bie.edu. DUE DATE: Wednesday, September 7, 2022 at 12:00 p.m. MD. All proposals are to be emailed ONLY to the Contracting Officer, Mary Jane Johnson, at maryjane.johnson@bie.edu, to be considered for award. Please see attached for all details. EVALUATION FACTORS: See SECTION L and M for evaluation factors for this solicitation to be considered for award. A. VOLUME I = Price � Total price reasonableness and completeness. The Government reserves its right to evaluate for price realism. B. VOLUME II = Technical � (acceptable/unacceptable) 1. Technical Approach 2. Key Project Management/Technical Support 3. Project Schedule 4. Quality Control Plan
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/0e6a8df87f97430aa6594964d54e3051/view)
 
Record
SN06450373-F 20220903/220901230123 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.