Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 21, 2022 SAM #7569
SOLICITATION NOTICE

Y -- Chesapeake Bay Oyster Recovery Program, Piankatank River, Virginia Phase 2 Reef Habitat

Notice Date
8/19/2022 8:53:58 AM
 
Notice Type
Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
W2SD ENDIST NORFOLK NORFOLK VA 23510-1096 USA
 
ZIP Code
23510-1096
 
Solicitation Number
W9123622B5014
 
Response Due
9/1/2022 11:00:00 AM
 
Archive Date
09/16/2022
 
Point of Contact
Tracey Strawbridge, Phone: 7572017145, Eartha Garrett, Phone: 7572017131
 
E-Mail Address
tracey.m.strawbridge@usace.army.mil, Eartha.D.Garrett@usace.army.mil
(tracey.m.strawbridge@usace.army.mil, Eartha.D.Garrett@usace.army.mil)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Amendment 0002 - 8/19/2022��This Amendment is issued to extend the bid closing by one day to Thursday, September 1, 2022 at 2:00pm EDT. As a result the Bid Opening will be extended by one day to Friday, September 2, 2022 at 2:00PM EDT. Amendment 0001 - 8/2 Adds 3 attachements Plans, Specs, and Solicitation.� 8/3 incorporates PIEE link to Attachments/Links section of SAM announcement. The Norfolk District, Corps of Engineers will be issuing a solicitation for a 100% small business set-aside, firm fixed-price, Invitation for Bid (IFB) to complete the CHESAPEAKE BAY OYSTER RECOVERY PROGRAM, PIANKATANK RIVER REEF HABITAT PHASE II, PIANKATANK RIVER, VIRGINIA. �The U.S. Army Corps of Engineers-Norfolk District in Partnership with the Virginia Marine Resources Commission will be issuing a contract for the Piankatank River, Phase 2-Reef Habitat Restoration Project. The Project is located near the mouth of the Piankatank River in Middlesex and Mathews Counties. The Project is obtaining, transporting and placing Class A-1 riprap via barge to the project site. All reef substrate will be placed by mechanical clamshell from a barge. and recorded by Clamvision to ensure proper placement and height. The reef will span across approximately 53 acres of Public Baylor Grounds, approximately 12-18� in height. Substrates will be placed in striations approximately 30 feet wide, spaced approximately 45 feet apart. The Base Bid consists of placement of reef structures on approximately 7.98 acres of the project site. Option 1 consist of placement of reef structures on additional 4.25 acres of the project site. Option 2 consists of the placement of reef structures on approximately 2.96 acres, and Option 3 includes the placement on approximately 3.36 acres. Reef substrate will be installed per the plan drawings and specifications on the project site in water depths ranging from approximately 0.96� MLLW to 0.10� MLW
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/2daabfc85fd049eba1424d0f9f5edf3f/view)
 
Place of Performance
Address: VA, USA
Country: USA
 
Record
SN06434230-F 20220821/220819230112 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.