Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF AUGUST 13, 2022 SAM #7561
SOLICITATION NOTICE

Y -- STRAWBERRY RECREATION SITE IMPROVEMENTS (Construct Tent Pads and Picnic Areas) / Black Hills National Forest

Notice Date
8/11/2022 8:49:01 AM
 
Notice Type
Presolicitation
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
LOLO NATIONAL FOREST MISSOULA MT 59804 USA
 
ZIP Code
59804
 
Solicitation Number
1284LM22Q0096
 
Archive Date
08/25/2022
 
Point of Contact
CO: Darrin Jackson
 
E-Mail Address
darrin.jackson@usda.gov
(darrin.jackson@usda.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
This is a PRESOLICITATION NOTICE ONLY, the solicitation with the specifications and attachments is expected to post within 15 days from this notice. This project is for a Total Small Business Set-Aside.��The North American Industry Classification System Code (NAICS) is�238990�with a size standard of�$16.5 million dollars. Description:� The U.S. Forest Service for the Black Hills National Forest intends to issue a�Request For Quotation (RFQ)�to award a single, firm-fixed-price contract to construct living areas, tent pads (4), and picnic areas (2) located at the Strawberry Lake Campground near Deadwood, South Dakota.� Work includes, but is not limited to, the Contractor furnishing all labor, materials, equipment, supplies, payment bonds, and incidentals to perform the work for this requirement in accordance with the specifications, terms and conditions, and provisions of the contract.� Refer to the summary of work below for details. Summary of Work: - Mobilization� - Removal of structures and obstructions� - Aggregate subbass, grading E, compaction B - Aggregate subbase, grading U, compaction B - Construct tent pads (treated structural timber and lumber)� - Construct steps (treated structural timber and lumber) - Furnish and Install closure barrier, type rock, 1 CY each� � Optional Work Items: - Aggregate subbase, grading E, compaction B� - Treated structural timber and lumber� ** This is a summary of work only, it is not a schedule. The schedule will be provided with the soliciation. ** Referenced Specifications:�The Standard Specifications for the construction for the Strawberry Lake Tent Pads shall conform to the specifications in the �Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, U.S. Customary Units� publication FP-14, 2014 Edition. This publication may be obtained from: https://flh.fhwa.dot.gov/resources/specs/ in either Microsoft Word (.doc) or Adobe Acrobat (.pdf) format. Project Location:�The project area is located approximately 5 miles South of Deadwood, SD 57732. �Take Highway 385 to the Strawberry Lake Campground; follow Forest Service Road (FSR) 760 for 0.3 miles to the site. Magnitude of Construction Project: The�magnitude of this Construction Project (IAW FAR 36.204) is�between $25,000 and $100,000. Contract Time:� It is estimated that once the contract is awarded, a notice to proceed (NTP) for materials will be issued. �Work is expected to begin on or around September 15, 2022. The Contractor shall begin work within 10 calendar days after the effective date on the notice to proceed. �The contract time is 100 calendar days from the effective notice to proceed; all work must be completed by May 30, 2023. �The contract time stated for completion shall include final cleanup of the premises.� The Government will issue a notice to proceed once weather and ground conditions are favorable for work. �The contract time will count from the date specified on the notice to proceed and run continuously with no shutdown upon favorable ground and weather conditions. � The Contractor shall maintain a rate of progress which will assure completion of work within the specified contract time.� Unfavorable weather and ground conditions:� The contract may be suspended by the Government if a written notice to suspend (NTS) is issued due to unfavorable weather and ground conditions; no contract time will be counted against the contract if work is suspended.� A written notice to resume (NTR) work will be issued by the Government to the Contractor.� The contract time will resume from the last day of work performed by the Contractor prior to the effective notice to suspend work.�
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a83590299c57413d87b715cfcc939ac2/view)
 
Place of Performance
Address: Deadwood, SD 57732, USA
Zip Code: 57732
Country: USA
 
Record
SN06423252-F 20220813/220811230122 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.