Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 25, 2022 SAM #7512
SOLICITATION NOTICE

15 -- DEPARTMENT OF STATE UH-1 (series) AIRCRAFT PROGRAMMED DEPOT MAINTENANCE (PDM) and H-60 Repairs

Notice Date
6/23/2022 7:18:26 AM
 
Notice Type
Presolicitation
 
NAICS
336411 — Aircraft Manufacturing
 
Contracting Office
ACQUISITIONS - AQM MOMENTUM WASHINGTON DC 20520 USA
 
ZIP Code
20520
 
Solicitation Number
19AQMM22R0006
 
Response Due
7/7/2022 11:30:00 AM
 
Archive Date
03/28/2022
 
Point of Contact
Patrick Murphy, Daniel Fernandez
 
E-Mail Address
murphypj@state.gov, fernandezdj@state.gov
(murphypj@state.gov, fernandezdj@state.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
The Department of State is issueing seven�draft RFP documents for industry review and comment.� Additional draft RFP document may be release soon after this release of documents.� Please note that H-60 repairs are now a part of the statement of work (attached).� Please submit comments on or before July 7, 2022. THE DEPARTMENT PUBLISHED Question and Answer Set #3. The Department of State requires, on a regularly scheduled calendar basis, a source to accomplish recurring Aircraft Condition Inspections (ACIs), aircraft modifications, corrosion identification, removal, treatment, and repair, component and accessory overhaul, and refurbishment of DoS UH-1 aircraft. The previously stated tasks will henceforth be referred to as Programmed Depot Maintenance (PDM) in this draft statement of work (SOW). PDM requirements are intended to reset all phased and periodic calendar and hourly airframe inspections to ensure a high level of operational availability in-between programmed depot intervals. Additionally, to the greatest extent possible all engine, aircraft, and accessory hourly and/or calendar-based time changes, overhauls, and inspections shall be accomplished to preclude such actions coming due within one (1) year or 300 airframe hours (whichever is less) after PDM accomplishment.�� It is anticipated that the PDM program will have the following induction schedule: Peru 3 aircraft per year Iraq 2 aircraft per year� Uruguay 1 aircraft per year Panama 2 aircraft per year� Costa Rica 1 per year� CONUS 1 aircraft per FY23, FY25, FY26 Since the majority of these aircraft are located in Central and South America, the Department of State is interested in the feasiblity� of performing the PDMs in a facility located in that region.��The Department of State is also releasing a draft version of the PDM statement of work for industry comment. Please submit your comments and request for information on or before October 29, 2021.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/a7dd138bf7d8453e8e5ed501917cc501/view)
 
Record
SN06367034-F 20220625/220623230121 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.