Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 17, 2022 SAM #7504
SPECIAL NOTICE

Y -- Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida-Industry Day

Notice Date
6/15/2022 12:09:15 PM
 
Notice Type
Special Notice
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
US ARMY ENGINEER DISTRICT JACKSONVI JACKSONVILLE FL 32207-0019 USA
 
ZIP Code
32207-0019
 
Solicitation Number
W912EP22Z0028
 
Response Due
6/21/2022 11:00:00 AM
 
Point of Contact
James T. Tracy, Phone: 9042322107, DeWayne A. Sparks, Phone: 9042321626
 
E-Mail Address
james.t.tracy@usace.army.mil, dewayne.a.sparks@usace.army.mil
(james.t.tracy@usace.army.mil, dewayne.a.sparks@usace.army.mil)
 
Description
Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida INDUSTRY DAY DATE: ����������� Wednesday, 22 January 2022 TIME:������������ 1:00pm Local Time LOCATION:� WebEx Presentation (a link will be posted via amendment prior to the presentation).� All interested parties must contact Mr. Dewayne Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil no later than the 21st of June 2022 by 2:00pm local time. �The link to access the industry day presentation will be posted via SAM.gov prior to 22 June 2022.� Failure to contact Mr. Sparks & Mr. Tracy on the above dates may result in your inability to attend the Industry Day for the Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill.� All interested Offerors are required to access SAM.gov for future updates. DESCRIPTION OF PROJECT:� The work will be performed in a rural area of Dade County, Florida. The entrance to the project site is on the north side of US-41 (Tamiami Trial) and approximately 12 miles west of the intersection with US-27. The Scope of Work for this project includes the following three (3) items, (A) Install the proposed L-67A levee structures; S-631, S-632, and S-633 detailed as new gated flood control culverts, with 5.5-ft. x 5.5-ft. manual vertical slide gates, two (2) sets of stop logs, each with total design capacity of 500 cubic feet per second (cfs) to convey water from WCA 3A to WCA 3B; (B) Degrade 15 existing spoil piles located along the west side of the L-67A canal and move the material onto the project construction site; and (C) Construct earthen plugs within the existing east-west agricultural ditch, degrade existing spoil piles along the north side of the ditch, and partially backfill portions of the ditch. Location of Project Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida. Specific Project Challenges The work will be performed in a rural area of Dade County, Florida with limited access along a narrow existing levee embankment. The work is along the existing L-67A levee and within the surrounding Everglades Swamp lands. The lands outside the footprint of the levee are prone to flooding at all times of the year and the ground conditions are very soft and wet during all times of the year. Some of the work is located in or along existing canals which will require barges for access. The work will also require processing of on-site materials to produce embankment fill materials meeting the project specifications. It is anticipated that the work within and along the agricultural ditch will require the use of amphibious equipment and the use of hydraulic pump operations to move materials for the proposed ditch plugs. The contractor must be able to provide as-builts of the finished work acceptable to the Government.� �� Environmental Conditions The contractor is required to remain within the construction limits in order to minimize impacts to wetlands. Plans and Specifications Abbreviated draft plans and summary of work specifications of�this project may be provided via amendment prior to the presentation.� ADDITIONAL INFORMATION REQUIRED: Provide an email to Mr. Sparks at dewayne.a.sparks@usace.army.mil & Mr. James Tracy at james.t.tracy@usace.army.mil to include the information listed below: Company Name Point of Contact Company Address Phone Number Email Address Duns Number Cage Code Offeror shall identify their size classification and Small Business Size: _ Large Business _ Small Business _Small Disadvantage Business _ 8(a) Small Business _ HUBZone _ SDVOSB � � � � �_WOSB Your email subject line should be addressed as �Industry Day Request � (Company Name) - Central Everglades Planning Project (CEPP), South Contract 1, L-67A Structures (S-631, S-632, and S-633) Spoil Pile Removal and Agricultural Ditch Backfill, Miami-Dade County, Florida in order to ensure all requests are handled in a timely manner.� The required information is due to Mr. Sparks & Mr. Tracy no later than 21 June 2022 at 2:00pm local time.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/6817b3a7cd864860bfdb271c317878e4/view)
 
Place of Performance
Address: Miami, FL, USA
Country: USA
 
Record
SN06358765-F 20220617/220615230106 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.