Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF JUNE 09, 2022 SAM #7496
SOLICITATION NOTICE

F -- Gold Stewardship IRSC

Notice Date
6/7/2022 3:43:03 PM
 
Notice Type
Presolicitation
 
NAICS
115310 — Support Activities for Forestry
 
Contracting Office
USDA-FS, STEWARDSHIP CONTRACTING BRANCH Washington DC 202501138 USA
 
ZIP Code
202501138
 
Solicitation Number
12363N22Q4032
 
Archive Date
06/30/2022
 
Point of Contact
Karen Ruklic, Contract Specialist, Phone: 2089831268 - email is preferred method of contact, Fax: 2089834098, Kasandra Meyer, Timber Management Officer, Phone: 5308367140, Fax: n/a
 
E-Mail Address
karen.ruklic@usda.gov, kasandra.meyer@usda.gov
(karen.ruklic@usda.gov, kasandra.meyer@usda.gov)
 
Description
Background: The Gold Stewardship IRSC shall be awarded under the following authority. Stewardship Authority:� Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014�Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999.� Project Location: All or Portions of T22N, R12E, Sections 21and 28, Mount Diablo Meridian.� The Gold Stewardship IRSC is located on the Beckwourth Ranger District of the Plumas National Forest. ~1.5 miles southwest of the town of Graeagle, CA. To reach the contract area from the town of Graeagle, travel south on Highway 89 for ~1 miles. Turn west on Gold Lake Highway (PC519) towards The Lakes Basin Recreation Area. Subdivision will begin within approximately 2 miles on the north side of the county road,� (See draft map uploaded as an attachment to this notice.) Description:�The objectives of this project are to promote healthy, diverse, fire-resilient forests, and improve water quality by performing the following mandatory work across 157 acres:��� Cut and remove green sawtimber (10.0 inches to 29.9 inches DBH). Cut, skid and deck green biomass (3.0 inches to 9.9 inches DBH) material. Perform temporary road construction. Recontour entrances from Plumas County Rd. 519 into the project area.� Permanently close temporary road access and spread logging slash within landings for erosion control. Provide traffic control. Chip and haul biomass material, including tops and limbs from sawlogs to a cogeneration plant. The cost for Item 1 has been appraised for in the timber value; therefore, separate payment for this work will not be made.� Estimated volume of sawtimber is 6,643 tons and the volume of biomass is 5,999 tons. Optional work items are anticipated to include: � � � � 7. Re-contour newly constructed bench skid trails � � � � 8. Re-contour newly constructed temporary roads. Period of performance is from date of award through March 31, 2025.��No site visit is planned at this time.� The complete solicitation is anticipated to be posted in May 2022.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/89202817d7564f7483fe3cd212709582/view)
 
Place of Performance
Address: Blairsden Graeagle, CA 96103, USA
Zip Code: 96103
Country: USA
 
Record
SN06349604-F 20220609/220607230057 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.