SOURCES SOUGHT
71 -- Console modernization at Long Beach Airport, CA
- Notice Date
- 5/31/2022 5:20:28 AM
- Notice Type
- Sources Sought
- NAICS
- 238390
— Other Building Finishing Contractors
- Contracting Office
- 697DCK REGIONAL ACQUISITIONS SVCS FORT WORTH TX 76177 USA
- ZIP Code
- 76177
- Solicitation Number
- 01569_Console_Modernization_Long_Beach_California
- Response Due
- 6/7/2022 12:00:00 PM
- Point of Contact
- Ms. Joni Haynes
- E-Mail Address
-
joni.l.haynes@faa.gov
(joni.l.haynes@faa.gov)
- Description
- Work includes, but is not limited to: A. Design of new slatwall console system for ten controller positions in the tower cab. Design must proceed through phases, with 45%, 70%, and 100% Design Submittals and Review B. Demolition of existing perimeter consoles and center turret. C. Fabrication and installation of new perimeter slatwall consoles, mounts, miscellaneous accessories, and appliances. All consoles are to be secured per the IBC for seismic design (assume I factor 1.5). D. Replacement of convenience sink, counters, cubbies, and millwork in cab. E. Removal of outlets, jacks, and plugmolds that may interfere with slatwall installation (See �Existing Electrical Drawings�). Replace receptacles inside consoles with new twist lock receptacles and provide power strips. Reuse existing conduits to provide power for new consoles where available. Remove outlets and jacks along wooden backsplash and provide new receptacles and jacks along galley/countertop backsplash. F. Replace and rewire light/dimmer switches in cab. G. Remove and replace multipoint ground plate in junction level. Connect new metal console busbars to new multipoint ground. Replace current single lug grounding connections with double lug connections. H. Mount Cab shade pulleys and hardware currently mounted to old consoles to new slat wall locations. I. Provide temporary power outlets for transition/installation. J. Provide and install new ESD carpet in Cab. K. Provide Electronic copies of shop drawings and plans. Drawings and plans must be in DWG format. L. With the FAA, implement the transition plan provided by the FAA to accomplish said work in such a way that the existing Air Traffic Operations can continue during the towers operational hours in the existing ATCT cab. �LGB Transition Plan & Drawings� is a living document and can be updated throughout the project. Changes to the transition plan will be discussed and implemented during the design and construction process.
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/4e24a307b98d40378a328f7dd1c1dc8d/view)
- Place of Performance
- Address: Long Beach, CA, USA
- Country: USA
- Country: USA
- Record
- SN06343201-F 20220602/220531230114 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |