SOLICITATION NOTICE

Z -- 674-22-2-5065-1473 | Metal Panel /Sidewalk Repairs for Building 189

Notice Date
5/31/2022 11:27:54 AM
 
Notice Type
Solicitation
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
257-NETWORK CONTRACT OFFICE 17 (36C257) ARLINGTON TX 76006 USA
 
ZIP Code
76006
 
Solicitation Number
36C25722Q0543
 
Response Due
6/5/2022 11:00:00 PM
 
Archive Date
07/06/2022
 
Point of Contact
LaNiece E Bowman, Contract Specialist
 
E-Mail Address
Laniece.Bowman@va.gov
(Laniece.Bowman@va.gov)
 
Awardee
null
 
Description
Questions and Answers Who will remove all utilities, security, sprinkler, standpipe, etc. from exterior walls prior to sheet metal demo? Ans: The VA will remove the utilities, security, sprinkler and standpipe. Is the height of the retaining wall to be 18 all the way to the end of the existing concrete wall as discussed in the site visit? Ans: Yes, 18 height and 8 wide all down to the walkway entrance. Please specify the portions of sheet metal that are to be replaced. Sheet metal to be replace is from where the brick ends on the wall outside the doorway entrance to the turn where the garage starts. Does the VA require the installation of an ADA ramp with a warning board at the end of the concrete run? Ans: Yes, it does to the parking lot. Is the contractor required to remove the wheel stop in front of the new ramp? Ans: yes, the contractor will be required to remove the wheel stop in front of the new ramp. Is the tree to near the end of the concrete run to be removed and include stump grinding? Ans: Yes, the tree is to be removed and including stump grinding. What is the concrete thickness requirement for the flume? Ans: 4 thick for the flume. What is the concrete thickness requirement for the retaining wall? Ans: 8 thick for the retaining wall Is rebar or fiber mesh required in the flume? Ans: Rebar is required for the flume set at 24 OC.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/221ee90e30b54bcdb2efce7a125b178e/view)
 
Record
SN06342600-F 20220602/220531230109 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.