MODIFICATION
Y -- Install Lab Hood B-1
- Notice Date
- 5/31/2022 6:50:29 AM
- Notice Type
- Solicitation
- NAICS
- 236220
— Commercial and Institutional Building Construction
- Contracting Office
- 242-NETWORK CONTRACT OFFICE 02 (36C242) ALBANY NY 12208 USA
- ZIP Code
- 12208
- Solicitation Number
- 36C24222B0036
- Response Due
- 6/13/2022 12:00:00 PM
- Archive Date
- 06/23/2022
- Point of Contact
- Lateisha Robinson, Contract Specialist
- E-Mail Address
-
lateisha.robinson@va.gov
(lateisha.robinson@va.gov)
- Awardee
- null
- Description
- FOR OFFICIAL USE ONLY STATEMENT OF WORK Replace Install Lab Hood-Bldg. 1 PROJECT NO. 561A4-20-105 This requirement is necessary to correct existing substandard equipment to include the replacement of fume hood and related HVAC Equipment. 1.Scope: Furnish professional construction services for replacement of existing fume hood and related HVAC Equipment in Building 1 lab at the VA NJ Health Care System, Lyons, NJ. and items show on drawings provided 2.. Performance Monitoring (if applicable). The designated COR will monitor the contract performance and make sure the contractor adheres to VA standards and designated project milestones as well as provide all necessary support required to complete the subject design. 3. Security Requirements. The contractor employees shall not have access to VA sensitive or computer information. The contactor / A/E will be required to undergo a background investigation and will be issued a government PIV flash badge. This procedure is conducted by the C.O.R. and PIV staff. The designated COR will certify the work done under the contract shall be performed to time and standard. Designated COR is also responsible to assure the inspection and acceptance of products provided incidental to services. 4. Risk Control The chosen firm shall provide a phasing and ICRA (infectious control risk assessment plan complying to drawings and specifications. 5. Place of Performance. Place of performance shall be at 151 Knollcroft Road, Lyons, NJ, 07939 6.. Period of Performance. 240 Days from the NTP date, in addition to the Construction Period Service. 7. Justification This requirement is necessary to correct existing substandard equipment to include the replacement of fume hood and related HVAC Equipment. 8. Estimated Cost $1,021,239.00
- Web Link
-
SAM.gov Permalink
(https://sam.gov/opp/7f18e9fe2739448ab12d4d17eed55cd2/view)
- Record
- SN06342225-F 20220602/220531230105 (samdaily.us)
- Source
-
SAM.gov Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's SAM Daily Index Page |