Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
SAMDAILY.US - ISSUE OF MAY 26, 2022 SAM #7482
SOURCES SOUGHT

99 -- RFI - PIP-II Cryogenic Distribution System (CDS) Installation ED0016633

Notice Date
5/24/2022 9:56:10 AM
 
Notice Type
Sources Sought
 
Contracting Office
FERMILAB - DOE CONTRACTOR Batavia IL 60510 USA
 
ZIP Code
60510
 
Solicitation Number
PIP-II-Cryogenic-Distribution-System-(CDS)-Installation-ED0016633
 
Response Due
6/16/2022 1:00:00 PM
 
Point of Contact
Jayson Eddy
 
E-Mail Address
jeddy@fnal.gov
(jeddy@fnal.gov)
 
Small Business Set-Aside
SBA Total Small Business Set-Aside (FAR 19.5)
 
Description
Fermi National Accelerator Lab (FNAL) is in the process of constructing a new accelerator, �PIP-II� [1]. This 800 foot long superconducting linear accelerator is already under construction, and will come online in 2029. PIP-II includes a dedicated cryogenic plant providing liquid and gaseous helium to components of the accelerator. The piping system which delivers the helium from the cryoplant to the accelerator is known as the Cryogenic Distribution System (CDS). This Request For Information (RFI) is intended to solicit information from potential vendors for the installation of the CDS within the PIP-II footprint. The CDS has four major components, shown in Figure 2, within the scope of this RFI: � The Distribution Valve Box (DVB) is located within the cryoplant building and serves as the interface between the cryoplant and the CDS. � The Intermediate Transferline (ITL) runs from the cryoplant building to the accelerator tunnel. This includes both a vacuum-insulated multi-circuit cold transferline and several single-wall warm piping runs. � The Tunnel Transferline (TTL) is the piping in the accelerator�s underground tunnel and includes interfaces for the accelerator components. This includes a vacuum-insulated multi-circuit cold transfer line with 26 modules (25 Bayonet Cans + 1 Turnaround Can) and several single-wall warm piping runs. � The warm gas pipe headers within CDS scope, include primarily helium gas piping as well as short sections or air, water, and nitrogen piping. The final connections between the TTL and the accelerator components (known as cryomodules) are accomplished with removable U-tubes. Cryomodules and U-tubes are outside the scope of this RFI.
 
Web Link
SAM.gov Permalink
(https://sam.gov/opp/ce40a639573b4e1eb23db053905267be/view)
 
Place of Performance
Address: Batavia, IL 60510, USA
Zip Code: 60510
Country: USA
 
Record
SN06337514-F 20220526/220524230128 (samdaily.us)
 
Source
SAM.gov Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's SAM Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.